Loading...
Signature-SY120605CDC Tracking Code: t-,® CDC APPLICATION CHECKLIST APPLICATION FORMS v Application Form Part 1 Application Form Pan 2 MAPS ` Location map V Hydraulic Work Map (4IT0 �j C- Site map !! Project boundary in digital format C`/D C MODEL FILES `! Pre- Pmject conditions and With - Project conditions models in digital format (qJ YA41 S ) i � Hard copy printouts and plots of cross - sections and water smdace elevation profiles for 100 -year / food and SPF for Pre - Project and With Tchnca s Z-�conditionsC:SeAt , 61) 4t i As. s a — $5,750 for effective flow am V $3,250 for ineffcctive flow area ____ so or exempted projects 40 Corridor DcvdopmuitCaQIjicauMom WEditim AW3.6 CDC Tracking Code O CDC APPLICATION - PART 1 To be completed by Applicant or Apphcant's representative and submitted to the appropriate local CDC/Floodplain Administrator. Attach additional pages as necessary apphcation is considered public information and wiR be distributed to federal, state, and local. governmental agencies as oudwed in the CDC Manual. ]. APPUCANT INFORMATION L9_1 Applicants Representadve. Identify person knowledgeable of and authorized to respond to questions concerning data provided by the Applicant. Nmw.._(<0AZIA W-. M4Vej -,50rj PC- d Relationship to Applicant: _li6J Vls U ��rit i�� i i~a7C 02-54 - -7 54 ~ 1(212, 11 �l '1'�t�T��Li�'L�.'��[i!'►y�nl' • w9i �I+ I'I 1 . J C/ Project Size (total acres): 4w CorridorDcvtlopm cMm WOEAioa AW 3.7 CDC Tracking Code• C_D P visa 8 — �D 1 2. LOCATION Provide general description of location, including street addnas, nearest cross street, and idend$ed LeA0 "131k 1 5iTAA+ e.- I i V t *e Den f-on Offie-k Add 4lon , ct" 4 eoep t 1 >4I Ind Co, ref. as , Latituddlongitude of project centroid (to six decimal places). Can be found using DFWmaps can: 32° 511 " N 011" 544 s 1, 57" vii Project boundary in *W format (if available) 3. PROPOSED PROJECT Proposed ,activity: (check appropriate categories) D dredp/chmmel modification 13 swak construction Su O levee 13 bd*Mver crossing W.ther (include explanation lure) Ee e.W'a+t Dn Proposed Use: (check appropriate categories) C1 private dangle dwelling(s) 0 private multi- dweuSag(s) O public acomnurcial O industrial, M�ffier (include explanation here) �.SS �s�BCI- Lt V t 11I 00 Corridor Devdo" MamW 4" Edwin Pagan CDC Tracking Code Cq OS b? l 2 --cD A Brief description of project: This project includes fill and excavation at the site. The site Wa;partialli filled as a result of a 1997 CDC approval, but none of the excavation was completed. The fill computations shown in this report are based on the current CDC model, and therefore does not include the 1997 partial fill since this was not offset with excavation. Fill Quantity: 12,840 CY and Excavation Quantity: 12,975 CY The project has no impact to the 100 year tloodplain elevation and the fill and excavation is balanced so there is no loss of storage. The project has no impact to the SPF condition. 4. PROJECT LOCATION WrM RESPECT TO INEFFECTIVE FLOW AREA ❑ Not located entirely within an ineffective flaw area ❑ Located entirely within both the Wien and the SPF ineffective flow area Be Located entirely within the 100 -year imeffective flaw am Daily 5. VERSION OF HEC -RAS USED IN THE ANALYSIS: im CarrWor Devdopmpat Cati/iaake Mm W 4a Edition Pgr39 CDC Tracking Code: LOOS- D� 12--c-) L 6. EXEMPTIONS AND VARIANCES Exaemption Category: (check if applicable - additional documentation may be required) ❑ Maintenance, repair, or identical replacesnwent of exdating infrastructure ❑ Outfall structures where the outfall has been permitted under the Federal NPDES or State TPDES program ❑ Intake structures ❑ Discharge of material for backHll or bedding for utility lines, provided that no significant change occurs" pre- existing bottom c0ntou1s and excess material is removed to a disposal area out of the Regulatory Zone ❑ Bank stabilization activities provided that no significant change occurs in pre - existing bottom contours and excess material Is removed to a disposal area out of the Regulatory Zone ❑ Small-scale projects that cause minimal change in gerund surface elevation and no decrease in hydraulic conveyance and valley storage for the 100 -year flood 0 Temporary construction - related activity ❑ Specific Prior Development - The existing development projects as defined in Section L7 DEFINITIONS AND ACRONYMS of this Manual and listed in Appendix B3 (also re&rred to as Grandfathered. Projects). Appheant requests a Variance to Common Pe rn* Criteria:- ❑ Yes VNo (If Yt5• Pkxw Cx&in mWmtb* information here) 40 Carrier Devslopnreaet Catijiuete Masser 4'r Edition Pdr_V10 CDC TracWng Code• C g ,CO S-6 .?) 7_ -= d CDC APPLICATION - PART 2 Dashed Hydrologic and Hydraulic Informs ion To be completed by Applicant or Applicant's represcntative and submitted to the appnopriate local' CDC/Floodplain Administrator. Attach additional pages as nocessary..This applicatio is considered public inkmnst nand will be distributed to fodcral, state, and local gpvaivmental agencies as outlined in the CDC MSC: 11V1_VL •� LT MT Ucvdopmart Catijtcatc MMW O Edition Pgsc3 -li J.Locati� Pre-Project Wkh�ftoject Diocharge . _ Downstream Boundary MB) cross - section g�2g � 4s 5:00 cfs . _ 43 6co n/a a n/a UI�� Baudary lam) cross-section: Q 3 L�..3 cj QO cfs 4 3 CJD(1 da da Channel velocity Downstream Boundary cross - section �t3�.�`� r0� ` . ©l fps fps Upstream Boundary cross- secaonn $ 4o. 1.51 fps 7151 fps O fps Water Surface Elevation (NGVD) feet downstream of DB cross- actional' 3 21, Z 3 i4�O ft �' 4i ft Q h foot downstream of DB cross - section AULIT�7 4ASi " ft 4+St ti ft o ft Downstream Boundary c�-secrim q �i2a7 - 44.4�.,ft 4+3 41 ft oft Md- project cross -aeon Q33 4'�',3. �p�o. ft 4+43. 66 ft 0 ft Ucvdopmart Catijtcatc MMW O Edition Pgsc3 -li code CDC Tracking Upstream on a �4 ./49;16 ft Q44, 66 ft o ft kgtt, feetDB v 6(o ft ` '4 �6 n ° ft W a feet Upstream of UB a use- _ aoction d� i a ,Q•�y61 ft �'�"� ► ©?ft Q ft �q3 feet-Upstream cf UB crow Section +414 4 ft ft o h 4eettpeamnofUB Project., an in 3, Zt-I ac . S, % q ac + z bloodpin . Vallry Pr*ct t 35.1 ac -ft ' 3� , ac-ft p ac -ft G59�9�0 C4 3za Total Valley. Stmoe b ac -ft Valley P. o:% Chmp CDC Tracking Cock: CO STAMnA On DD n= -r ICr non ienM Parameter Location PrrPraject With - Project Discharge Downstream Boundary (DB) crow- aecdonc132 �ZG� cfs 2, 0 0 n/a a n/a Upstream Boundary (UB) cross -sew g3vt q v 192.00 Ch 1120C) by n/a © da v�ty n 5, 68 5 ,' fpa a fps Upstream corm -mzon Q3944 3.3 � 3� ' fps "', 0 1 fps Water Surface Elevation (NGVD) feet downstream of DB .,� ft a ft feet downstream of DB crowwcdon q 3 IR7 �p �-'� t.�� ft 44g,4*7 ft d ft Downstream cross -sec ion � 7 4M .41 ft 41 ft o ft won 3 0`� ft �I ft O fc Upstream Boundary crowsectim v 1Z ft 4IR,'17,ft o ft 6oet Upstream of DB cross - sedan 93 40 `i'4"� ,�� 1 ft 440, I" { h (' ft a* Corribravd" aaCatiJtcmcMmw ,0Edition Pdr3 -]3 BY CDC Tracking Code: CA [ © -S0,4� I Z --v . 4* Co rido c Mmaml 4" Edidm POSO.14 CDC. Tracking Code; (-,Oe Q S (Z 7. VALLEY STORAGE MITIGATION Describe hydraulic mitigation used to compensate for project valley storage impacts, @l ��akl'��'t� IZ�S�fo cy G7c L a 0 0.�10,n I Z YQ'15 Cq Application is hereby submitted for a Corridor Development Certificate (CDC). I certify that 1 am knowledgeable of the information contained in this application, and that to the beat of my knowledge and be lief, this information is true, complete, and accurate. Signature of CDC Applicant or Applicant's Representative h Typed Name/Titk/Date 5 P.E. License Number and seal/stamp CwkIo►Dcvc4m Msra�sl �' Edition Pgsr3.15 1- b . 0V'1y 1� °�7i