Big Cedar-CS 920608MEMO
TO:
FROM:
SUBJECT:
DATE:
Building Inspections
Kenneth M. Griffin, P.E., City Engineer ~
Early Building Permits - Big Cedar Addition
June 8, 1992
I have recently received a request for early building permits on five lots
within the Big Cedar subdivision from Mr. Tim House, of Matthews
Southwest. The lots requested are Lots 7, 10, 15, 35 and either Lot 2 or
16. The engineering department has no objections to the issuance of those
early building permits providing the following conditions are met:
1) Elevation certifications will be required on Lots 2, 7 and 10.
2)
No Certificates of Occupancy should be issued on any lots until
the construction of Harris/Bethel School Road from Plantation
to the Big Cedar addition is complete and accepted by the City.
3)
The building permit on Lot 7 should not be issued until the
inlet in front of Lot 7 is complete. That completion can be
verified through Larry Davis of the engineering department,
when the permit is requested on Lot 7.
4)
Access will be required at all times for fire protection. This
means that during construction, the portion of Harris Road
between Brooks Lane and the Big Cedar Addition must be kept
open.
5) The plat should be filed.
6)
The following items must be completed: water meters set,
sanitary sewer manholes adjusted, water valves adjusted and the
parkway should be shaped and backfilled.
A~tO this memo is a photo cop~%9~ac~rtion of the Big Cedar
addleS. This photo copy shows~overf1OW'channel between Lots 6
and 7. This overflow channel should be constructed at %he time the house
is constructed. If it is already in place, it should remain in this
general configuration after the house is completed. Also, on the same
photo copy, notice the note concerning the slope protection on the backs
of Lots 3, 4, and 5.
If you should have any questions concerning this issue, please feel free
to contact the engineering department at your convenience.
cc:
Larry Davis, Engineering Construction Inspector
Gary L. Sieb, Director of Planning and Community Services
Tim House, Vice President, Matthews Southwest
OF SLOPE
498.0
\
\
\
Wl~BING (F.r~V, amat) WiTH IVY OR HONEYSUCKLE TO S~I.J=PLEMB~
Sj. OeE STABi.iTy. HOMEOWN~ ASSOC, RESPONS~LE FOR Si-O~ -
MAi~B~CE Wm4N BIG CEDAR EXCt.UI3I~G LOT 4,?-
F.F. 499.0
/
....... / /
BROCK STREET / ,,,~
/
F.F. 499.0 /
, /
S 13"29'4T' W
36.98'
OVERFLOW CHANNEL SECTION
BETWEEN LOTS 6 & 7