Loading...
ST0501-CS120618 T H E G I T Y O F COPPELL 1_ _ ., , * s e x A 5., , a q June 18, 2012 Robert Caudill Tiseo Paving Company PO Box 270040 Dallas TX 75227-0040 RE: ST 05-01 Deforest Rd Reconstruction Overtime Inspection Dear Mr. Caudill: In accordance with your request, the City of Coppell Engineering Department provided inspection service at the referenced location on Saturday, June 16, 2012. The overtime rate including salary and benefits is $54.00 per hour. Seven hours were charged to your company on that date. Please send a copy of this letter along with your check for $378.00, payable to the City of Coppell to the following address: City of Coppell Finance Dept. 255 Parkway Blvd P.O. Box 9478 Coppell, TX 75019 If you should have any questions,please call (972) 304-3679. Sincerely, La . vis Con' o,ction Inspector Office Phone: (972) 304-3684 Fax: (972) 304-3570 cc: Finance Dept. Project Fee File 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 06/14/2012 10:44 9722165637 TISED PAVING PAGE 01/03 IFP r P.O. Box 270040 Dallas,Texas 75227-0040 Telephone (972) 289-0723 Fax (972) 216°5637 Thursday,June 14, 2012 The City of Coppell Via Facsimile Attn: Larry Davis Re: DeForest Road Tiseo Paving Co. is requesting to work Saturday,June 16", 2012. Further,we agree to pay for inspector overtime as required. Sincerely, /tforliadavo Robert Caudill Vice President Sete dlta&ed 1974