Loading...
North Gateway 6-CS120622 T H E C I T Y O F SWLILLeti•L, COPPELL _v \,_ v\i/ A S 1 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Ken Griffin,P.E., Dir. of Engineering/Public Works Glenn Hollowell, P.E.,Asst. Dir. of Public Works Michael Arellano, Chief Building Official Michael Garza, P.E., Civil Engineer Lee Stone, Commercial Bldg. Inspector Tim Oates,Deputy Chief/Prevention From: Albert Samaniego, Construction Inspector Office Phone: (972) 304-3685 Fax: (972) 304-3570 Date: June 22, 2012 RE: WALK-THRU INSPECTION for North Gateway Plaza,Lot 6 Block A(Wilken Family Eye Care) --Lot next to Rosa's Cafe-- A final walk-thru for paving, utilities and drainage on the referenced project has been scheduled for: Monday, June 25, 2012 at 9:00 a.m. Please let me know if I can be of further assistance. cc: Debbie Ingram, Public Works Michael Corder, Streets Dept. "CITY OF COPPELL ENGINEERING-EXCELLENCE BY DESIGN" Rhonda Adloo Subject: Walk-thru for Wilkens Eye Care Location: North Gateway Plaza Lot 6 (next to Rosa's Cafe) Start: Mon 6/25/2012 9:00 AM End: Mon 6/25/2012 10:00 AM Show Time As: Tentative Recurrence: (none) Meeting Status: Not yet responded Organizer: Rhonda Adloo Required Attendees: Debbie Ingram; Michael Arellano; Michael Corder; Michael Garza; Lee Stone; Tim Oates; flebahn @structures-interiors.com A final walk-thru for paving,utilities and drainage on the referenced project has been scheduled for: Monday,June 25,2012 at 9:00 a.m. 1