North Gateway 6-CS120622 T H E C I T Y O F
SWLILLeti•L,
COPPELL
_v \,_
v\i/
A S 1
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Ken Griffin,P.E., Dir. of Engineering/Public Works
Glenn Hollowell, P.E.,Asst. Dir. of Public Works
Michael Arellano, Chief Building Official
Michael Garza, P.E., Civil Engineer
Lee Stone, Commercial Bldg. Inspector
Tim Oates,Deputy Chief/Prevention
From: Albert Samaniego, Construction Inspector
Office Phone: (972) 304-3685
Fax: (972) 304-3570
Date: June 22, 2012
RE: WALK-THRU INSPECTION for
North Gateway Plaza,Lot 6 Block A(Wilken Family Eye Care)
--Lot next to Rosa's Cafe--
A final walk-thru for paving, utilities and drainage on the referenced project has been
scheduled for:
Monday, June 25, 2012 at 9:00 a.m.
Please let me know if I can be of further assistance.
cc: Debbie Ingram, Public Works
Michael Corder, Streets Dept.
"CITY OF COPPELL ENGINEERING-EXCELLENCE BY DESIGN"
Rhonda Adloo
Subject: Walk-thru for Wilkens Eye Care
Location: North Gateway Plaza Lot 6 (next to Rosa's Cafe)
Start: Mon 6/25/2012 9:00 AM
End: Mon 6/25/2012 10:00 AM
Show Time As: Tentative
Recurrence: (none)
Meeting Status: Not yet responded
Organizer: Rhonda Adloo
Required Attendees: Debbie Ingram; Michael Arellano; Michael Corder; Michael Garza; Lee Stone; Tim Oates;
flebahn @structures-interiors.com
A final walk-thru for paving,utilities and drainage on the referenced project has been scheduled for: Monday,June 25,2012
at 9:00 a.m.
1