RE: North Gateway Plaza Addition,Lot 6 Block A
Conditional Final Acceptance
Dear Mr. Lease:
Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the
referenced project. Final acceptance of the project is conditional on two items:
1. Receipt and approval of as-built drawings from the engineer of record.
2. Receipt of 2-year maintenance bonds covering 50% of the value of improvements including
utilities,paving and storm drainage structures, including covered quantities.
A letter of Final Acceptance will be issued when the two remaining items listed have been received by
this office.
Sincere y,
Albert Samaniego
Construction Inspector
Office Phone: (972)304-3685
Fax: (972) 304-3570
cc: Ken Griffin,P.E., Director of Engineering&Public Works
Glenn Hollowell, P.E.,Asst. Director of Public Works
Michael Arellano, Chief Building Official
Tim Oates, Deputy Chief/Prevention
Jennifer Miller, Finance Director
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673