Loading...
North Gateway 6-CS120622 (2) T H E C I T Y O F COPPELL ,,_ T . . _* ,,; )17-, r * 4.Steven Lease June 22,2012 Structures&Interiors 1594 Hart Street Suite 100 Southlake TX 76092 RE: North Gateway Plaza Addition,Lot 6 Block A Conditional Final Acceptance Dear Mr. Lease: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. Final acceptance of the project is conditional on two items: 1. Receipt and approval of as-built drawings from the engineer of record. 2. Receipt of 2-year maintenance bonds covering 50% of the value of improvements including utilities,paving and storm drainage structures, including covered quantities. A letter of Final Acceptance will be issued when the two remaining items listed have been received by this office. Sincere y, Albert Samaniego Construction Inspector Office Phone: (972)304-3685 Fax: (972) 304-3570 cc: Ken Griffin,P.E., Director of Engineering&Public Works Glenn Hollowell, P.E.,Asst. Director of Public Works Michael Arellano, Chief Building Official Tim Oates, Deputy Chief/Prevention Jennifer Miller, Finance Director 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673