Loading...
Carrollton-CS 890523May 23, 1989 Russell Doyle, City Engineer City of Coppell P. O. Box 478 Coppell, Texas 75019 Dear Russell: As you know, the city of Carrollton has been considering a request for a sanitary landfill use since January of this year. The proposed site for the landfill is located within our city, but the access to the site is proposed from Sandy Lake Road within the city of Coppell. On May 18, 1989, the Planning and Zoning Commission recommended approval of the request subject to the attached conditions. The request is scheduled to be heard by the Carrollton City Council on June 20, 1989. If you should have any questions regarding this request, please do not hesitate to call me at 466-3036. Sincerely, Kathy~sivers Senior Current Planner KS:gm STIPULATIONS SUMMARY 01-89SUP4 1. Landfill shall be a Type I sanitary landfill, and shall be developed, operated, maintained and reclaimed in accordance with the Municipal Solid Waste Management Regulations of the state of Texas and all other applicable state laws, the applicable regulations of the U. S. Environmental Protection Agency, and all other applicable federal laws; 2. Site shall be developed in accordance with the conceptual development plan; 3. A litter control fence shall be erected and maintained in accordance with the fencing details; 4. Screening shall be erected and maintained in accordance with the screening plan; 5. A 404 Westlands permit shall be obtained from the Corps of Engineers, or a letter from the Corps stating that such permit is not required, prior to the commencement of any operations on the site; 6. A FEMA permit shall be obtained, or a letter from FEMA stating that such permit is not required, prior to the commencement of any operations on the site; 7. A Texas Water Commission permit shall be obtained, or a letter from the Texas Water Commission that such permit is not required, prior to the commencement of any operations on the site; 8. A permit shall be obtained from the Texas Department of Health prior to the commencement of any operations on the site. All requirements of such permit shall be complied with; 9. Construction drawings of the driveway and driveway cut shall be submitted to, and approved by, the city of Coppell prior to the commencement of any operations on the site; 10. The roadway to the office and shop facility shall be an all-weather surface, in accordance with the 1985 Uniform Fire Code; 11. At least one thousand (1,000) feet of the access road extending from Sandy Lake Road shall be paved, in accordance with the landfill access plan. -1- STIPULATIONS SUMMARY 01-89SUP4 12. Landfill operation shall be defined as an industrial user so that the city shall be allowed access for monitoring, record review and complaint and compliance investigation in accordance with the Industrial Waste Ordinance; 13. No fill operations shall be permitted on the site until the Trinity River Bridge is repaired to an HS-15 rating, as defined by the American Association of State Highway and Transportation Officials. The city must verify the HS-15 rating before commencement of fill operations; 14. If the bridge is not repaired to these standards within five (5) years, the city shall initiate a reassessment of the zoning of the site. -2-