Loading...
ST0501-CS120625 T H E C I T Y O F COPPELL Tk, , -, -* F ', q S A S 1 June 25,2012 Robert Caudill Tiseo Paving Company PO Box 270040 Dallas TX 75227-0040 RE: ST 05-01 Deforest Rd Reconstruction Overtime Inspection Dear Mr. Caudill: In accordance with your request, the City of Coppell Engineering Department provided inspection service at the referenced location on Saturday, June 23, 2012. The overtime rate including salary and benefits is $54.00 per hour. Four and one half hours were charged to your company on that date. Please send a copy of this letter along with your check for $243.00, payable to the City of Coppell to the following address: City of Coppell Finance Dept. 255 Parkway Blvd P.O. Box 9478 Coppell, TX 75019 If you should have any questions,please call(972)304-3679. Sincerely, •,, L. D avis Co st ction Inspector Of' 'e Phone: (972) 304-3684 Fax: (972) 304-3570 cc: Finance Dept. Project Fee File 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 06/14/2012 10:44 9722165637 TISEO PAVING PAGE 02/03 ter' PAVING COMPANY P.O. Box 270040 Dallas, Texas 75227-0040 Telephone (972) 289-0723 Fax (972) 2165637 Wednesday,June 20th, 2072 The City of Coppell Via Facsimile Attn: Larry Davis Re: DeForest Road Tiseo Paving Co. is requesting to work Saturday,June 23rd', 2012. Further, we agree to pay for inspector overtime as required. Sincerely, 4-d4i)e-4A0 Robert Caudill Vice President 544 l e.d 1974