ST0501-LR120619 JUN-22-2012 06: 14 P.01
®a
AvA
, _.
,.. Texas CM I Inca
Post-it®Fax Note 7671 Date #of
Constructs tt Materials Testing +pages►
and Environmental Consulting To L i?1 . -)14 V 1 s From Texas ejvi.. .7
Co./Dept.JNSPre o1M1 Co. 6e-C- ems S-i l i-446
10044 Monroe Drive • Dallas, Texas 75229 Phone#6)-72 3 41 ��'`
(214) 352. cr./ i Q,,( Phone# t21 4J3 .�g5-�7
F a x 6 F a x 1—a'77SZ.�,1(7L_
REPORT OF CONCRETE MIX OBSERVATION
Report Date: June 19, 2012 Date Concrete Placed:
June 12, 201 Standard 6"x12"Cylinders
Client. City of Coppell
I ylinder Cross-sectional Arca:28.27 Square Inches
Project: Deforest Road Reconstruction
Contractor: California Construction Concrete Report No.: 36
Concrete Supplier and Plant: Redi-Mix Concrete /P259 Project No.:211-0125
C'
Location of Placement: Stem Wall, S. Side, from Sta. 15+74 to 15+42 & 9+85 to 9+5City of Coppell Project No.: ST OS-01
MATERI S Source/ SSD Batch Wts. OBSERVATION :A A
Description (Lbs/CuYd)
°Mix Number: 10L11602 Ti a Sam a atched: 11:33 AM
Cement: Ti a ed. 12:40
Fly Ash: y ; S 1 ati : : "5+64,Bottom Half
Coarse Aggregate:
/ lu icket No: 1237/25484469
e ture:
Intermediate Aggregate: ( I. Ambient R.• 86°F
Fine Aggregate: 1 +; Concret- • g: 89°F
Admixtures: Slump Range(i es): 7.25
1 Weather Con.'ions: Partly Cloudy
TimeS . ,4: 11:00 AM
2 Time pleted: 2:15 PM
Added Water: 15 Gallons k s•:... e Air Content(%):. 3.8
.tal Cubic Yards Placed: 10
Required Strength(Lbs./sq.,n.): _ 3,600
Specimen Measured Age Date Total Load Compress - ' • gth
Number Slump(in.) (Days) Tested (Lbs.) (L• . Remarks .
.
DFR 141 7 6/19/12 128,020 •,530
DFR 142 28 7/10/12 •
7.25 •
DFR 143 28 7/10/12 •
DFR 144 H Hold
Test Methods Utilized Fracture Regular
ASTM C-3I,C-39, C-143 (Unless.Noted Otherwise) Cylinders Made B : 1 G
Remarks and/or Distribution:
cc: Mr. Larry Davis - City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570
Mr. George Marshall - City of Coppell,Phone: 972-304-3562; via E-mail: gMarshal@coppelltx.gov
Mr. Dan DeGroot - Burgess &Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.S eGI'Ioot @BurgessNiple.com
Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail: rC. dill @TiseoPaving.com
Mr. 1lter Mitchell - Tiseo Paving Company, via E-mail: bamobas @yahoo.com •
& Mr. > bby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bo$by@CalConTex.com
Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by:
(,244g,QSL----
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval cf Texas CMT,lnc. The use of our name must receive
our poor written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative ol'the quantities of apparently identical or similar products,
JUN-22-2012 06:14 P.02
C
Texas CMT, Inc.
,. *
Construction Materials Testing GEE consultants, Inc.
10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com
•
GENERAL REPORT ❑ CANCELLATION • STAND-BY
Report Date: June 19,2012 Test Date: June 18,2012
Client: Tiseo Paving Company Cancellation/Standby Report No. 4
Project: Deforest Road Reconstruction Project N amber: 211-0126
Identification: Stand-by City of Coppell Project No.: ST-05-01
Page: 1 of 1 .
Results
Scheduled Concrete Arrival Time 12:00 PM
Type of Service Scheduled: Concrete Testing
•
Time Concrete Arrived at Job: 2:00 PM
Total Charged Time: 2.0 Hours
Reason: Waiting for Redi-Mix Delivery of California
Construction Stem Wall Concrete
Technician: RG
cc: Mr. Larry Davis-City of Coppell,Phone: 972-304-3684;via Fax: 972-304-3570
Mr.George Marshall-City of Coppell,Phone:972-304-3562;via E-mail:gMarshal @coppelltx.gov
Mr.Dan DeGroot-Burgess&Niple,Inc.,Phone:972-620-1255;via E-mail:Dan.DTGroot @BurgessNiple.com
Mr.Robert Caudill-Tiseo Paving Company,Phone:972-289-0723;via E-mail:rCaudill@TiseoPaving.com
Mr. Bobby Bounds-California Construction,Phone: 972-670-0368; via E-mail:Bo by @Ca1ConTex.com
Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: 0020 54.______----
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the giantities of apparently identical or similar products.
•
JUN-22-2012 06:15 P.03
C
4�
Texas CMT, Inc.
Construction 1tterials Testing GEE ConuItants, Inc.
and Enviro >' tal Consulting
10044 Monrre Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (2:4) 352.6972 • www .texascmt.com
GENERAL REPORT • CANCELLATIO ❑ STAND-BY
Report Date: June 19,2012 Te t Date: June 19,2012
Client: Tiseo Paving Company Cancellation/Standby Rep rt No. 5
Project: Deforest Road Reconstruction Proje:.t N mber: 211-0126
Identification: Cancellation City of Coppell Proj et No.: ST-05-01
Page: 1 of 1
Results
Scheduled Time: 10:00 AM Co AV
Type of Service Scheduled: Concrete Testing
Time Left Lab: 9:00 AM
Time Arrived at Job: 9:45 AM
Tin1fe Left Job: 11:25 AM --•■■ •
Time Returned to Lab: 12:00 PM
Total Charged Time: 3.0 Hours
Reason: Concrete not available due to sc i eduling mix-up with Redi-
Mix Concrete and California donstruction. Concrete
rescheduled for 2:00 PM today.
Technician: RG
cc: Mr.Larry Davis-City of Coppell,Phone: 972-304-3684;via Fax:972-304-3570
Mr.George Marshall-City of Coppell,Phone:972-304-3562;via E-mail:gMarshal1 @coppelltx.gov
Mr.Dan DeGroot-Burgess&Niple,Inc.,Phone:972-620-1255;via E-mail:Ean.DeGroot @BurgessNiple.com
Mr.Robert Caudill-Tiseo Paving Company,Phone:972-289-0723;via E-mail:rCaudill@TiseoPaving.com
Mr.Bobby Bounds-California Construction,Phone:972-670-0368;via E-mail:Bobby @CalConTex.com
Texas CMT,Inc. TBPE Firm: F-4521 Reviewed by: 0---24-104'--
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are nor necessarily indicative of th=quantities of apparently identical or similar products.
TOTAL P.03