Loading...
Coppell Ind 2-CS120629 T H E C 1 T Y O F COPPELL O A S , June 29, 2012 Kerry Roetzel Hillwood Investments 3090 Olive Street, Suite 300 Dallas,Texas 75219 RE: Availability of City Utilities Coppell Industrial Addition, Block A, Lot 2 (Tradepoint) Dear Kerry: This letter is in response to an email the Engineering Department received from you concerning the availability of utilities to the referenced property. To the best of my knowledge the utilities are as follows: WATER: There is currently a 16"water line in the centerline of Bethel Road with a 10" stub out to this property and a 12" water line in the south right-of-way of Creekview Drive. The Design Engineer will need to evaluate the lines in regard to available volume and pressure for your development. Additional fire hydrant protection for this development shall be in accordance with the City of Coppell Rules and Regulations, and as determined by the Fire Marshal. SANITARY SEWER: There is currently a 15"sewer line that is located in Bethel Road with an 8" stub out to this property. STORM DRAINAGE: A previously constructed detention basin exists to accommodate drainage on the site. However, internal storm sewer will be required to drain developed conditions to the detention basin. In addition, there is a 27" storm drain in Creekview Dr. and a 30" storm drain in Bethel Rd. As always, in the development of the property your Engineer should determine if the existing utilities available to this site are adequate to serve your proposed development. If you have any questions or comments please contact me at the number below. Sincer,;l 4, Mic ae G.r • P.E. Civil Engineer Office Phone: (972)304-7019 Fax: (972)304-3570 mgarza@coppelltx.gov 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673