Big Cedar-CS 920304PROJECT NAME:
CITY OF COPPELL
PRE-CONSTRUCTION CONFERENCE
DATE:
TIME:
ASSIGNED INSPECTOR:
I. A~7~F~ND~:
II. PLANS FURNISHED TO:
III.
IV.
(See Attached List )
A) CITY YES
B) CONTRACTOR YES
¢) am~a YES
UTILITY COMPANIES NOTIFIED:
A) TR. LV. PHONE
B) GAS
C) ELECTRIC
D) CABLE T.V.
E) OTHER
STATUS OF RIGHT-OF-WAY AND/OR LAND ~NTS:
EASE~F~TS YES
HIG~AY PERMIT YES
RAILROAD PERMIT YES
STREET CUT PERMIT YES
BORING PERMIT YES
INSPECTION:
A. DAILY INSPECTION BY ASSIGNED INSPECTOR
AFTER HOURS AND ~.~ (OVERTIME) TO
BE PAID BY THE CONTRACTOR "AT OVERTIme3
CONTRACTOR AND SUB-C~RS TO NOTIFY
INSPECTOR AT LF. AST TWENTY-FOUR (24) HCX3RS
BEFORE WATER/SANITARY Sf~ER/STORM Sf~ER/
PAVING CONSTRUCTION BEGINS.
(2)
VI.
VIII.
IX.
Xo
TESTING OF MATERIALS:
1. DENS ITIES
2. , APPROVED CONCRETE BATCH DESIGN
3. CONCRETE PAVING INCLUDING CORES
4. APPROVED ASPHALT BATCH DESIGN
SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR
STREET CLOSING REQUIRED: YES
IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE
AND FIRE DEPARTMENT SEVENTY-7%~O (72) }KDURS IN
ADVANCE.
CONSTRUCTION BARRICADES AND TRAFFIC CONTR(~:
A. REQUIRED
B. TRAFFIC DETOUR
C. WARNING LIGHTS
IF STREET DEPARTS~RT HAS TO COME OUT TO MOVE
THE BARRICADES AND/OR REPLACE ANY BARRICADES,
THE CONTRACTOR WILL BE CHARGED FOR THEIR TI~.
AS-BUILT PLANS:
CONTRACTOR AND/OR ENGI~R WILL BE RESPONSIBLE FOR
SUBMI~ING THE CORRECT "AS-BUILT" PLANS TO THE CITY.
INFORMATION:
DEVELOPER:
ADDRESS:
PHONE:
PROJECT MANAGER:
CONSULTING ENGINRR. R:
NAME:
ADDRESS:
PHONE:
PROJECT ENGINEER:
(3)