Loading...
Big Cedar-CS 920217 OODWIN ARSHALL CIVIL ENGINEERS ~ PLANNERS ~ SURVEYORS February 17, 1992 Engineering Development, Inspector City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 RE: Construction Costs for Big Cedar Addition, CoppeR, Texaa Dear Mr. Davis: As you are aware, the developer of the Big Cedar Addition has previously paid inspection fees based on an Engineer's Opinion of Probable Cost of $261,868.00. Enclosed please find copies of the itemized contract prices as awarded for the project. The sum total of contract awards for the project was $272,060.30. Based on this difference and using the two percent inspection fee, the amount still owed for construction inspection has been calculated to be $203.85. Please feel free to contact me if you have any questions regarding this issue. Sincerely, D. Matthew Goodwin, P.E. DMG/jc 6001 BRIDGE STREET, SUITE 100 / FORT WORTH. TEXAS 76112 / 817-429-4373 (METRO) PJ 0 0 }-,. 0 CRB-111-3 CITY OF COPPELL 255 Pm~Nay Boulevard COPPELL. TEXAS 75019 214/462-0022 -¥1.-~: - ' -:;':~.....~: ~(.,-.!-~. ~