Loading...
Cambridge Phase 2-LR 970519EOTECH NICAL GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Conc~te Supplier and Plant: Location of Placement: May 19, 1997 Date Concrete Placed: April 17, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase II Gilco Construction N/A Sidewalks Standard 6 "x 12" Area 28.27 Square Inches Concrete Report No.: 12 Project Number: 96-0298 MATERIALS s .... / SSD Ba,~, wts. INSPECTION DATA I~$cription (Lbs/CuYd) Mix Number: Time Sample Batched: " Time Sampled: Cement: Sample Location: Fly Ash: Truck/Ticket No: Coarse Aggregate: Tempera. tare: Intermediate Aggregate: Ambient Range: Concrete Range: Fine Aggregate: Slump Range (incbes): Admixtures: Weather Conditions: 1 Time Started: 12:15 pm 2 Time Completed: 2:15 pm Added Water: Sample Air Content (%): Total Cubic Yards Placed: Required Strength (Lbs./sq.in.): N/A Specimen Measured Age Date To~l Lo~d Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (L~./Sq.ln.) ECM 44 7 04/24/97 94,960 3,560 Note: Information provided by ECM 45 N/A 28 05/15/97 110,900 3,920 contractor Test Metho~ Utilized Fracture Regular Cylinders Made By: Contractor ASTM C-3l,C-39,C-143 (Unlesl Noted Otherwise) Remarks and/or Distribution: All information provided by contractor cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell All letters and reports are for the exclusive use of the client to whom they are addresscd and shall not be rcprOducod without the full approval of 62 E Cons , our prior written approval. Our letters and reports apply only to the sample te~tod and/or impected and are not necessarily indicative of the quantities of apparently identical or similar products,