Loading...
Cambridge Phase 2-LR 970506EOTECH N ICAL E NGINEERING F GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: May 6, 1997 Date Concrete Placed: April 17, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase II Gilco Construction N/A Sidewalks . Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 12 Project Number: 96-0298 MATERIALS Source! SSO ~at~h w~,. INSPECTION DATA Description (Lbs/CuYd) Mix Number: Cement: Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: 1 2 Added Water: Time Sample Batched: Time Sampled: Sample Location: Truck/Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: 12:15 pm Time Completed: 2:15 pm Sample Air Content (%): Total Cubic Yards Placed: Required Strength (Lbs./sq.in.): N/A Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs,) (Lhe,/Sq.ln.) ECM 44 7 04/24/97 94,960 3,560 Note: Information provided by ECM 45 N/A 28 05/15/97 contractor Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Cylinders Made By: Contractor Remarks and/or Distribution: All information provided by contractor cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced wtthout the full approval of GEE Consultants luc The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or inspected and are not necessarily indicative of the quantities of apparently identical or similar pt'oducts.