Cambridge Phase 2-LR 970430JEOTECHNICAL E J NGINEERING GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: April 30, 1997 Date Concrete Placed: April 2, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase II O.K. Concrete Pioneer/27 Inlet Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 11 Project Number: 96-0298 MATERIALS s .... / sso ~a,~. Wts. INSPECTION DATA Description (Lbs/CuYd) Mix Number: 9339 Cement: 5 sk Fly Ash: Coarse Aggregate: Intermediate Aggregate: Flue Aggregate: Admixtures: AEA 1 2 Added Water: 0 gallons Arrive .lob: Time Sampled: Sample Location: Track/Ticket No: Temperature: Ambient Range: 76° Concrete Range: 74° Slump Range (inches): 3 IA" Weather Conditions: Cloudy Time Started: 2:00 pm Time Completed: 5:00 pm Sample Air Content (%): 4% Total Cubic Yards Placed: 5 2:10 pm 3:10 pm Inlet 540' North of Allen & 665' East of Deforest 395/394936 Required Strength (Lbs./sq.in.): 3500 psi Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq. ln.) ECM 40 7 04/09/97 116,420 4,120 ECM 41 7 04/09/97 117,860 4.170 ECM 42 3 ~A" 28 04/30/97 ] 123,020 4,350 ECM 43 28 04/30/97I 140,980 4,990 Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless No~ed Otherwise) Cylinders Made By:AIA Remarks and/or Distribution: cc: Mr. Jack Bommarito - Beamer Development, Inc. : Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell I'- Jlho it tbe fuji al rovej olrG · , . All letters and reports are for the exclusive use of the client to wham they are addressed and shall not be reproducod w u ppr EE Comultants lac The use of oar name must receive our prior written approval Our letters and reports apply only to the sample tested and/or inspected and are m~ necessarily indicative of the quantities of apparently identical or similar products. EOTECH NICAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: April 30, 1997 Date Concrete Placed: March 27, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase II Gilco Contracting, Inc. TXI/#41 Paving Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 08 Project Number: 96-0298 MATERIALS Source~ SSD Batch Wts. INSPECTION DATA Description (LbslCuYd) Mix Number: 8272A Cement: 5 sk Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: AEA 1 2 Added Water: 10 gallons Arrive Job: Time Sampled: Sample Location: Truck/Ticket No: Temperature: Ambient Range: 60° Concrete Range: 68° Slump Range (inches): Weather Conditions: Cloudy Time Started: 11:00 am Time Completed: 2:15 pm Sample Air Content (%): 5 % Total Cubic Yards Placed: 10 12:09 pm 12:45 pm 12' West & 7' North of Southeast comer of endtranee off of Deforest 669/761508 Required Strength (Lbs./sq.in.): 3000 psi Specimen Measured ^g~ Date Total Load Compressive Strength Remarks Numher Slump (in.) (Days) Tested (Lin.) (Lbs./Sq.ln.) ECM 28 7 04/03/97 73,860 2,610 ECM 29 7 04/03/97 74,680 2,640 6" ECM 30 28 04/24/97 94,060 3,330 ECM 31 28 04/24/97 94,520 3,340 Test Methods Utilized Fracture Regular Cylinders Made By: DF ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell (~~ Mr. Dale Gilreath - Gilco Contracting ~ C~u:~tant~, x,,c. Reviewed byl . All letters and reports nrc for the exclusive use of the client to whom they are addressed and shall not he ~produced withoul the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or inspected and are r~ necessarily indicative of the quantities of apparently identical or similar products. EOTECHNICAL E NGINEERING E[ NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION April 30, 1997 Date Concrete Placed: March 31, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase II Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: Drain Inlet Caps MATERIALS Source/ ~S,,,atch W.. INSPECTION DATA Description (Lbs/CuYd} Standard 6"x12' Area 28.27 Square Inches Concrete Report No.: 09 Project Number: 96-0298 Mix Number: Arrive Job: Cement: Time Sampled: Fly Ash: Sample Location: Truck/Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: Fine Aggregate: Concrete Range: Admixtures: Slump Range (inches): Weather Conditions: I Time Started: 2 Time Completed: Added Water: Sample Air Content (%): Total Cubic Yards Placed: Required Strength (Lbs./sq.in:): Partly Cloudy Specimen Measured Age Date Total Lead Compressive Strength Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) Remarks ECM 32 7 04/07/97 125,360 4,430 ECM 33 7 04/07/97 118,760 4,200 ECM 34 28 04/28/97 134,840 4,770 ECM 35 28 04/28/97 131.860 4.660 Test Methods Utilized Fracture Regular · ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Cylinders Made By: Contractor Remarks and/or Distribution: cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell {~ Consultants, /ne. r m~.,,,,,4 byF(~~,_ All letters and reports are for the exclusive use of the client to whom they a e addressed and shall not be r~.prnduced without the full apProval of GEE Consultants. Inc. The use ofoor name must I~C~ive our prior written approval. Our letters and reporu apply only to the sample tested and/or inspected and are not necessarily indicative of the quamities of apparently identical or similar products. EOTECH N ICA L E NGINEERING E J NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: April 30, 1997 Date Concrete Placed: April 1, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase II O.K. Concrete Pioneer/27 Drain Inlets (Castlecreek Drive) Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 10 Project Number: 96-0298 MATERIALS Source/ SSD Batch Wts. INSPECTION DATA Description (LbslCuYd) Mix Number: 9339 Cement: 5 sk Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: AEA 1 2 Added Water: 0 gallons Arrive ]'ob: Time Sampled: Sample Location: Track/Ticket No: Temperature: Ambient Range: 73° Concrete Range: 74° Slump Range (inches): 2" Weather Conditions: Cloudy Time S~arted: 2:45 pm Time Completed: 4:30 pm Sample Air Content (%): N/A Total Cubic Yards Placed: 8 2:15 pm 3:25 pm Slopes @ drainage inlets on either side @cun, e 6531394885 Required Strength (Lbs./sq.in.): 3500 psi Specimen Measured Age Date ToLal Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) ECM 36 7 04/08/97 116,540 4,120 ECM 37 2" 7 04/08/97 116,590 4,120 ECM 38 28 04/29/97 149,140 5,270 ECM 39 28 04/29/97 152,160 5,380 Test Methods Utilized Fracture Regular · ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Cylinders Made By:GK Remarks and/or Distribution: cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell ~ eon~ul~:ane,,, xnc. a.-~e,Faa )=v.f(~~--~ All letters and repotu are for the exclusive use of the client to whom they are addressed and shall no~ be re~ndue~d without the full approval of GEE Comulmnts, Inc. The me of our Fame must receive out In'ia' written approval. Our letters and reports apply only to the sample leaed and/re' inspected and are not necessarily indicative of the qFaraities of apparemly identical or similar prnducu.