Loading...
Cambridge Phase 2-LR 970422' EOTECHNICAL E i NGINEERiNG I E JNVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive * Dallas, Texas 75229 * (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: April 22, 1997 Date Concrete Placed: March 24, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase II Gilco Contracting, linc. TXI/#48 Paving Castle Creek Drive Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 07 ~'roject Number: 96-0298 MATERIALS ~rce, ssD a,tc, w,. INSPECTION DATA De~c~ipliou (LbslCuYd) Mix Number: 8272A Cement:' 5 SiC Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: AEA 1 2 Added Water: 10 gallons Arrive Job: Time Sampled: Sample Location: Tmck/Ticket No: Tempe£ature: Ambient Range: 80° Concrete Range: 78° slump Range (inches): ! th" Weather Conditions: Partly Cloudy Time Started: 9:15 am Time Completed: 7:45 pm Sample Air Content (%): 3% Total Cubic Yards Placed: 360 3:35 pm 4:00 pm Station I + 605' East of West Curb 669/761508 Required Strength (Lbs./sq.in.): 3000 psi Specimen Measured Age Date Total Lead Compressive Strength Remnrks Number Slump (in.) (Days) Tested (Lbs.) (Lbe./Sq.ln.) ECM 24 7 03/31/97 95,080 3,360 ECM 25 11/2" 7 03/31/97 97,740 3,460 ECM 26 28, 04/21/97 146,580 5,190 ECM 27 28 [ 04/21/97 142,000 5,020 Test Metho~ Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Cylinders Made By: DF Remarks and/or Distribution: cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis-City of Coppell ;~y~.~ Mr. Dale Gilreath - Gilco Contracting , ..~ {~ COI~]~.~.,I.~,I]~, T~. aevieve~ by, ( All letters and repot'ts are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval ff GEE Consultant~, Inc. The use of our name must receive our prior written approval. Oar letters and reports apply only to the sample tented and/or inspected and are not necessarily indicative of the quantities of aPParently identical or similar products. EOTECHNICAL E j NGINEERING E INVIRoNMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352:5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: April 22, 1997 Date Concrete Placed: March 24, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase II' Gilco Contracting, Inc. TXI///41 Paving Castle Creek Drive Standard 6'x12' Area 28.27 Square Inches Concrete Report No.: 06 Project Number: 96'0298 MATERIALS s~,~, sso Batch wa. INSPECTION DATA Description (Lbs/CuYd) Mix Number: 8272A Arrive Job: Cement: 5 sk Time Sampled: Sample Location: Fly Ash: Truck/Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 80° Concrete Range: 76° Fine Aggregate: Slump Range (inchos): 2 ¼" Admixtures: AEA Weather Conditions: Partly Cloudy 1 Time Started: 9:15 am 2 Time Completed: 7:45 pm Sample Air Content (%): 2 t/z % Added Water: 20 gallons Total Cubic Yards Placed: 230 Required Strength (Lbs./sq.in.): 3000 psi 1:35 pm 2:10 pm Station 3 + 90; 4' East of West curb 456/761322 Specimen Measured Age Date Total Load Compressive Strength Remark~ Number Slump (in.) (Days) Tesled (Lbs.) (Lbs.lSq.ln.) ECM 20 7 03/31/97 91,300 3,230 ECM 21 2 IA" 7 03/31/97 92,120 3,260 ECM 22 28 04/21/97 126,160 4,460 ECM 23 28 04/21/97 124,200 4,390 Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless No, ed Otherwise) Cylinders Made By: MF Remarks and/or Distribution: cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. D~e Gilrea~ - Gilco Contracting ~ ~t~, ~n~. nevAewed by, " All letters a~ r~ a~ f~ t~ excl~ive ~e of ~ client lo w~m ~cy ~e ~ress~ aM s~ll ~ ~ r~r~ed wit~t t~ full ~al of GEE ~utta~. Ira. T~ me of ~ ~ m~l ~ ~r pri~ ~itten ~1. ~r letlers aM ~ a~ly ~ly to t~ shale ~st~ aM/~ im~c~ a~ are ~ ~es~rily iMicali~ of t~ ~mit~ of ~remly ~m~l ~ slmil~ ~B. EOTECH N ICAL ENGINEERING EJ NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: April 22, 1997 Date Concrete Placed: March 24, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase II Gilco Contracting, I:~c. TXI/#41 Paving Castle Creek Drive Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 05 Project Number: 96-0298 MATERIALS Source/ SSD Batch Wis. INSPECTION DATA Description (Lbs/CuYd) Mix Number: 8272A Cement: 5 sk Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: AEA 1 2 Added Water: 20 gallons Arrive Job: Time Sampled: Sample Location: Tmckfricket No: Temperature: Ambient Range: 78° Concrete Range: 79° Slump Range (inches): 2'6" Weather Conditions: Partly Cloudy Time Started: 9:15 am Time Completed: 7:45 pm Sample Air Content (%): 2%% Total Cubic Yards Placed: 130 12:08 pm 12:40 pm Station 5 + 50; 5' East of West curb 460/761154 Required Strength (Lbs./sq.in.): 3000 psi Specimen Measured Age Dale Total Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) ECM 16 7 03/31/97 102,200 3,610 ECM 17 21/~. 7 03/31/97 99,140 3,510 ECM 18 28 04/21/97 131,340 4,650 ECM19 28 04/21/97 [ 135,500 4,790 [ Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless Noted O~r~,ise) Cylinders Made By: MF Remarks and/or Distribution: cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell Mr. Dale Gilreath - Gilco Contracting G~ Con~uit~nt~, lne. All lelters and repe~is are for the exclusi,~ use of the client to whom they are addressed and shall no~ be reproduced without the full spprovel of GEE Comulmnis, Inc. The use of our name must receive our prior written approval. Our lettcrs and reporls apply only to thc sample tested and/or inspected and are not necessarily indicative of Ibc qtmmities of nppnreotly identical or similar products. EOTECHNICAL E NGINEERING E J NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: April 22, 1997 Date Concrete Placed: March 24, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase II Gilco Contracting, Inc. TXI/#41 Paving Castle Creek Drive Standard 6'x12" Area 28.27 Square Inches Concrete Report No.: 04 Project Number: 96-0298 MATERIALS s~,-~/ SSD Batch Wts. INSPECTION DATA Description (Lbe/CuYd) Mix Number: 8272A Cement: 5 sk Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: AEA 1 2 Added Water: 20 gallons Arrive lob: Time Sampled: Sample Location: Track/Ticket No: Temperature: Ambient Range: 80° Concrete Range: 78° Slump Range (inches): i '/~" Weather Conditions: Partly Cloudy Time Started: 9:15 am Time Completed: 7:45 pm Sample Air Content (%): 4% Total Cubic Yards Placed: 70 11:25 am 11:55 am Station 6 + 90; 8' North of South curb 669/761076 Required Strength (Lbs./sq.in.): 3000 psi Specimen Measured Age Date Total Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) ECM 12 7 03/31/97 105,060 3,720 Unit Weight 147.1 pcf ECM 13 7 03/31/97 111,760 3,950 Truck 456 also tested and found to ECM 14 1V2" 28 04/21/97 137,160 4,850 have t/~. inch slump and unit weight ECM 15 28 04/21/97 132,400 4,680 of 148.7 pcf Test Methods Utilized Fracture Regular Cylinders Made By: MF ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell Mr. Dale Gilreath - Gilco Contracting All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced withoul the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or inspected and are not necessarily indicative of the quantities of apparently identical or similar products.