Loading...
Cambridge Phase 2-LR 970411EOTECHNICAL ENGINEERING E J NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: April 11, 1997 Date Concrete Placed: April 1, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase II O.K. Concrete Pioneer/27 Drain Inlets (Castlecreek Drive) Standard 6'x12" Area 28.27 Square Inches Concrete Report No.: 10 Project Number: 96-0298 MATERIALS so~ sst, ~.teh wts. INSPECTION DATA Description (Lba/CuYd) Mix Number: 9339 Arrive Job: Cement: 5 sk Time Sampled: Sample Location: Fly Ash: Truck/Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 73 ° Concrete Range: 74° Fine Aggregate: Slump Range (inches): 2" Admixtures: AEA Weather Conditions: Cloudy I Time Started: 2:45 pm 2 Time Completed: 4:30 pm Sample Air Content (%): N/A Added Water: 0 gallons Total Cubic Yards Placed: 8 Required Strength (Lbs./sq.in.): 3500 psi 2:15 pm 3:25 pm Slopes @ drainage inlets on either side @ curve 653~394885 Specimen Measured Age Date Tntal Load Compressive Strength Remarks Number Slump (in.) (Days) Tested (Lbs,) (Lbs./Sq.ln.) ECM 36 7 04/08/97 116,540 4,120 ECM 37 2" 7 04/08/97 116,590 4,120 ECM 38 28 04/29/97 ECM 39 28 04/29/97 Test Methods Utilized Fracture Regular · ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Cylinders Made By:GK Remarks and/or Distribution: cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis-City of Coppell All lette~ and reports are for the exclusive use of the client ~, whom they are addressed and shall no( be reproduced without the full afl)royal of GEE Consultants, Inc. The use of our name nutst receive our prior written approval. Our lee. ers and repo~ apply only to the sample tested and/or inspected and are not necessarily indicative of the quantities of apparently identical of similar products. EOTECHNICAL GEE Consultants, Inc. 10046 Monroe Drive * Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: April 11, 1997 Date Concrete Placed: April 2, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase II O.K. Concrete Pioneer/27 Inlet Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: I 1 Project Number: 96-0298 MATERIALS so~, sSO,u,ch w,. INSPECTION DATA Description (Lbs/CuYd) Mix Number: 9339 Cement: :5 sk Fly Ash: Coarse Aggregate: Intermediate Aggregate: Fine Aggregate: Admixtures: AEA 1 2 Added Water: 0 gallons Arrive Job: Time Sampled: Sample Location: Truck/Ticket No: Temperature: Ambient Range: 76* Concrete Range: 74' Slump Range (inches): 3 ¼" Weather Conditions: Cloudy Time Started: 2:00 pm Time Completed: 5:00 pm Sample Air Content (%): 495 Total Cubic Yards Placed: 5 2:10 pm 3:10 pm Inlet 540' North of Allen & 665' East of Deforest 395/394936 Required Strength (Lbs./scl.in.): 3500 psi Specimen Measured Age Date Tolal Load Compressive 5uenjth Remarks Number Slump (in.) (Days) Tested (Lbs.) (LM./Sq. ln.) ECM 40 7 04/09/97 116,420 4,120 ECM 41 7 04/09/97 117,860 4,170 3'A" ECM 42 28 04/30/97 ECM 43 28 04/30/97 Met~ts Utilimi Fracture ~eSnlar Cylinders Made By:GK ASTM C-31,C-39,C-t43 (Unless Nmed Otherwise) Remarks and/or Distribution: cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell All le~ ~ ~ ~e ~ ~ e~lmi~ ~ ~ tM cleat to w~ tMy ~c ~d aM sMI ~ ~ ~ wi~ ~ ~il ~1 ~ GEE C~ulm~, lin. ~ me ~ ~ m~ mint r~l~ ~ ~ ~it~n ~r~l. ~ lem~ ~ ~ ~ly ~ly m t~ sample m~ aM/~ im~ a~ a~ ~ ~s~ily IM~ti~ ~ ~ ~mit~ of ~y ~i~ ~ simil~ p~.