Loading...
Cambridge Phase 2-LR 970410EOTECH NICAL ENGINEERING EJ NVIRONMENTAL GEE Consultants, inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION April 10, 1997 Date Concrete Placed: March 31, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase II Report Date: Client: Project: Contractor: Concrete Supplier and Plant= Location of Placement: Drain Inlet Caps MATERIALS s~,~e/ SSD Batch Wis. INSPECTION DATA Description (Lbs/CuYd) Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 09 Project Number: 96-0298 Mix Number: Arrive Job: Cement: Time Sampled: Sample Location: Fly Ash: Track/Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: Fine Aggregate: Concrete Range: Slump R~nle (inches): A~mlatures~ Wea~er Conditions: I Time Started: 2 Time Completed: Added Water: Sample Air Content (%): Total Cubic Yards Placed: Required Strength (Lbs./scl.in.): Partly Cloudy Specimen Measured Age Date T~al Load Compressive Stren~h Remarka Number Slump (in.) (Days) Tes~d (Lb~.) (Lbs./Sq. ln.) ECM 32 7 04/07/97 125,360 4,430 ECM 33 7 04/07/97 118,760 4,200 ECM 34 28 04/28/97 ECM 35 28 04/28/97 Test Methods Utilized Fracture Regular · ASTM C-31,C-39,C-143 (Unless Noted Otherwise) Cylinders Made By: Contractor Remarks and/or Distribution: cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell All letters and repom are for the exclusive use of the client to whom they are address, and ,hell not be teprod~ without ~be LII stol of GEE Comulntnts. Inc. The use of our name must receive our prior vn'itten approval. Our letters and reports apply only lo the sample tested and/e~ imFected and are not necessarily indicative of the quan~ki.'_s of apparently identical or similar producte.