Cambridge Phase 2-LR 970407EOTECH N ICAL
EJNGINEERING
GEE Consultants, Inc.
10046 Monroe Drive · Dallas, Texas 75229
REINFORCING STEEL PLACEMENT
Report Date:
Client:
Project
Identification
Method of Test
April 7, 1997
Beamer Development, Inc.
Estates of Cambridge Manor Phase II
Reinforcing Steel Inspection
Visual Inspection
· (214) 352-5433 · Fax (214) 352-6972
Test Date: March 27, 1997
General Report No.: 1
Project No.: 96-298
Page 1 of 1
Results
On March 27, 1997, reinforcing steel was inspected at the following locations:
Paving: Entrance off of Deforest
There were no discrepancies.
Tech: DF
cci
Mr. Jack Bommarito - Beamer Development, Inc.
Mr. David Carlton - Dowdy Anderson Associates
Mr. Larry Davis - City of Coppell