Loading...
Cambridge Phase 2-LR 970407EOTECH N ICAL EJNGINEERING GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 REINFORCING STEEL PLACEMENT Report Date: Client: Project Identification Method of Test April 7, 1997 Beamer Development, Inc. Estates of Cambridge Manor Phase II Reinforcing Steel Inspection Visual Inspection · (214) 352-5433 · Fax (214) 352-6972 Test Date: March 27, 1997 General Report No.: 1 Project No.: 96-298 Page 1 of 1 Results On March 27, 1997, reinforcing steel was inspected at the following locations: Paving: Entrance off of Deforest There were no discrepancies. Tech: DF cci Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdy Anderson Associates Mr. Larry Davis - City of Coppell