Loading...
Rosebriar-PT120710MMMMW WNW Im _40IM" lw� 9mm am SWPPP INSPECTIONS, INC.--Don Wims 972.530.5307 FOR THE Texas Commission on Environmental Quality (TCEQ) Storm Water Program TPDES GENERAL PERMIT TXR150000 The following information is posted in compliance with Part II.E.2. of the TCEQ General Pen-nit Number TXR150000 for discharges of storm water runoff from small construction sites. Additional information regarding the TCEQ storm water permit program may be found on the internet at: httt)://www.tceci.state.tx.us/nav/oermits/wci construction.html Operator Name: Rosebriar Development, LLC Contact Name and Phone Number: SWPPP INSPECTIONS, INC.--Don Wims 972.530.5307 Rosebriar Project Description: Physical address or Dallas Mapsco IA — TU description of'the sites location, estimated start Coppell, TX 75019 date andprojected end date, or date that disturbed soils will be stabilized Estimated Start Date: 7/15/2012 Projected End Date: 03/15/2013 Location of Storm Water Pollution Prevention Plan: 300 E John Carpenter Fwy, Suite 940 Irving, Texas 75062 For Small Construction Activities Authorized Under Part II.E.2. (Obtaining Authorization to Discharge) the following certification must be completed: I Brad Meyer (Typed or Printed Name Person Completing This Certification) certify under penalty of law that I have read and understand the eligibility requirements for claiming an authorization Linder Part II.E.2. of TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution prevention plan has been developed and will be implemented prior to construction, according to permit requirements. A copy of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4. I am aware there are significant penalties for providing false information or for conducting unauthorized discharges, including the possibility of fine and imprisonment for knowing violations. _ Signature and Titlee5?,� Date 7 //a Date Notice Removed -M,54 operator notified per Part H. F 3. I For Small Construction Activities Authorized Under Part II.E.2. (Obtaining Authorization to Discharge) the following certification must be completed: I Brad Meyer (Typed or Printed Name Person Completing This Certification) certify under penalty of law that I have read and understand the eligibility requirements for claiming an authorization Linder Part II.E.2. of TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution prevention plan has been developed and will be implemented prior to construction, according to permit requirements. A copy of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4. I am aware there are significant penalties for providing false information or for conducting unauthorized discharges, including the possibility of fine and imprisonment for knowing violations. _ Signature and Titlee5?,� Date 7 //a Date Notice Removed -M,54 operator notified per Part H. F 3.