Cambridge Phase 2-LR 970326EOTECH NIC^L
GEE Consultants, Inc.
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433
GENERAL REPORT . SIEVE ANALYSIS,
· Fax (214) 352-6972
Report Date: March 26, 1997
Client: Beamer Development, Inc.
Project: Estates of Cambridge Manor, Phase II Project No:
Identification: Sieve Analysis of Road Mixed Material (lime treated)
Method of Test: TEX-101-E
Test Date: March 20, 1997
General Report No.: 1
96-0298
Results
Location
1. Castle Creek Drive
Station I + 00
2. Castle Creek Drive
Station 4 + 00
3. Castle Creek Drive
Station 7 + 00
Actual Pergent Passine
1% Sieve #4" Sieve
Specifications
SDHPT Item 260 - 1972
Minimum Percent Passine
I~A" Sieve #4 Sieve
100% 60.1% 100% 60%
100% 61.2% 100% 60%
100% 67.1% 100% 60%
All tests meet project specifications.
Technician: GK
cc: Mr. Jack Bommarito - Beamer Development Mr. David Carlton - Dowdy Anderson
Mr. Larry Davi~ - City of Coppell
Our letters and reports are for the exclusive use of the client to whom they are addressed. Thc use of our name must receive our prior written approval. Our letters and reports
apply only to the sample tested and/or inspected, and are not necessarily iadicative of the quantifies of apparently identical or similar products.