Loading...
ST0501-LR120711 JUL-11-2012 04:48 P.05 C 1 flPri Texas CMI ,1 - Construction Materials Testing GEE Corsu kInc. and Environmental Consulting 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax (214) 352-6972 • www .texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date: July 11, 2012 Date Concrete Placed: June 13, 2012 Standard 6x12°Cylinders Client: City of Coppell Cylinder Cross-sectional Area:28.27 Square Inches Project; Deforest Road Reconstruction Concrete Report No.: 37 Contractor: California Construction Project No 211-0125 Concrete Supplier and Plant: Redi-Mix Concrete /P259 City of Coppell Project No.: ST-05-01 Location of Placement: Stem Wall, S. Side, from Sta. 15+02 to 15+42 & 9+85 to 10+17 MATERIALS Source/ SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) I Mix Number: 10L11602 Time Sample Batched: 12:28 PM Cement: Time Sampled: 1:25 PM Fly Ash: Sample Location: Sta. 15+06,Bottom Half Truck/Ticket No: 1208/25484981 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 80°F Fine Aggregate: Concrete Range: 84°F Admixtures: /. / Slump Range(inches): 9.0* Weather Conditions: Partly Cloudy . 1 Time Started: 12:00 PM 2 Time Completed: 3:15 PM Added Water: 0 Gallons Sample Air Content(%): 2.1 Total Cubic Yards Placed: 9 Required Strength(LbsJsq.tn-): 3,600 . Specimen Measur-i Age Date Total Load Compressive Strength Number Slump .) (Days) Tested (Lbs.) ' R-•• ks , (Lbs./Sq.In.) DFR 145 7 6/20/12 113,880 4,030 DFR 146 28 7/11/12 138,700 4 910 9.0* 7 DFR 147 28 7/11/12 137,040 4,850 DFR 148 H Hold Test Methods Utilized Fracture Regular ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Cylinders Made By: RG Remarks and/or Distribution: *Informed Manuel and Polio of California Construction of slump. / ,Q cc: Mr. Larry Davis- City of Coppell, Phone: 972-304-3684; via Fax: 972-304-3570 /7 Mr. George Marshall - City of Coppell, Phone: 972-304-3562; via E-mail: gMarshall @.coppelltx.gov / I e t z••/ Mr. Dan DeGroot- Burgess &Niple, Inc., Phone: 972-620-1255; via E-mail: Dan.DeGroot @BurgessN le.co Mr. Robert Caudill - Tiseo Paving Company, Phone: 972-289-0723; via E-mail; rCaudill@TiseoPaving.com Mr. Walter Mitchell - Tiseo Paving Company, via E-mail: barnobas @yahoo.com Mr. Bobby Bounds - California Construction, Phone: 972-670-0368; via E-mail: Bobby @CalConTex.com 02145://se_______ Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. TOTAL P.05 JUL-11-2012 04:47 P 01 c I Texas CM/. Inc. Post-it®Fax Note Date #of Construction Materials Testing e � 7671 pages► and Environmental Consulting To LARKY DA v 75 From Texas �,,eM.-yr• /� co./Dept.J 5 cc Fro Co. �C `-„'vf 5 0!t-/Lu 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352. Phone# t'C• 0172-364- �rJ�I Phone#2-14 352•c 7SZ Fax#Ct72-3E4-3576 Fax#z 14,352,617 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 19 (211-0125 /ST-05-01) Method:ASTM D6938 D698 Page 1 of 1 Client:City of Coppell Material Description Maximum Optimum Project:Deforest Road Reconstruction Dry Density Content (Lbs/CuFt) Percent Test Date:July 9,2012 9:00 AM 1 Yellowish Brown Clayey Sand with D Irk 115.5 12.4 Gray Silty Clay(Mixed) Report Date:July 11,2012 !2 Dark Gray Clayey Sand with Occasional Rock 112.6 12.9 F ents and Yellowish Brown Clayey Sand 3 ar ay S' Clay with Occasional) 104.0 15.0 Required Density(%): Min.95% Aggregat 4 Dark ay and Yellowish Brown Sandy Clay 109.5 15.3 Required Moisture()/n):Clay:OMC+S%; 5 Gray Clay 101.5 17.9 Sand:OMC±3% 6 Yellowish Brown Silty Sand with Sandy Clay 108.6 13.0 Balls 7 Dark Gray and Dark Brown Clay 100.4 22.2 Test No. Material Probe Location/Elevation(and/or)Lift In-Place j In-Place Percent No. Depth • Dry Density Moisture Compaction (inches) (Lbs/Cu.Pt.) Content(%) (%) 45 6 6 So ide Wall Backfill,Sta. 18+50, 12' 107.3; 10.9 •8.8 -.of all, 1'6"Below Top of Wall 46 6 6 Sout, t ide Wall Backfill, Sta. 16+00,8' 116.4 8.0* a N. •f all, 1'6"Below Top of Wall 1 �Fest results did not meet project specifications . l / cc: Mr. Larry Da fe#, : ity of •ppell,Phone:972-304-3684;via Fax: 972-304-35701 Mr. George fy all-Ci' of Coppell,Phone:972-304-3562;via E-mail:gMar hall @coppelItx.gov Mr.Dan DeGr■ -Burt-ss&Niple,Inc.,Phone:972-620-1255;via E-mail:Dan.DeGroot @BurgessNiple.com Mr. Robert Ca 11 -iseo Paving Company,Phone:972-289-0723;via E-mail:1!Caudill @TiseoPaving.com Mr. Walter Mitch-ll-Tiseo Paving Company,via E-mail: bamobas @yahoo.com� Mr.Bobby Bounds-California Construction,Phone:972-670-0368;via E- Bo by @CalConTex.com tZ leot 1 ...... Texas CMT, Inc. TBPE Firm: F-4521 Revie . • bv: �LM All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced witho. .e full approval'of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not nec..• ..'y indicative of the quantities of apparently identical or similar products. I JUL-11-2012 04:48 P.02 c A ty Texas 0119 Inc. Construction Materials Testing GEE consultants, Inc. 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352-6957 • Fax 214) 352.6972 • ( www .texascmt.com I REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No.20 (211-0125 /ST-05-01) Method:ASTM D6938 D698 Page 1 of 1 Client:City of Coppell Material Description Maximum Optimum Dry Moisture Project:Deforest Road Reconstruction Density Content (Lbs/CuFt) Percent Test Date:July 9,2012 4:00 PM I Yellowish Brown Clayey Sand with Dark I15.5 12.4 Gray Silty Clay(Mixed) 2 Dark Gray Clayey Sand with Occasional Rock 112.6 12.9 Report Date:July 11,2012 Fragments and Yellowish Brown Clayey Sand 3 Dark Gray Silty Clay with Occasional I 104.0 15.0 Required Density(%):Min.95% Aggregate 4 Dark Gray and Yellowish Brown Sandy Clay 109.5 15.3 Required Moisture(%):Clay:OMC+5%; 5 Dark Gray Clay 101.5 17.9 Sand:OMC±3% 6 Yellowish Brown Silty Sand with Sand Clay 108.6 13.0 Balls 7 Dark Gray and Dark Brown Clay 100.4 22.2 • Test No. Material Probe Location/Elevation(and/or)Lift . In-Place I In-Place Percent No. Depth Dry Density Moisture Compaction (inches) (Lbs/Cu.Fit.) Content(%) (°/ 47 6 6 Retest No.46 114.7 I 10.2 105.6 ! 48 6 6 South Side Wall Backfill,Sta. 17+00, 10' 113.3 10.4 ■4 N.of Wall, l'6"Below Top of Wall Test results meet project specifications . cc: Mr. Larry Davis-City of Coppell,Phone:972-304-3684;via F. • `72-304-3570 Mr. George Marshall-City of Coppell,Phone:972-304-3562 ail:gMarshall@coppelltx.gov Mr.Dan DeGroot-Burgess&Niple,Inc.,Phone:972-620-1 E-mail:Dan.DeGroot @BurgessNiple.com Mr.Robert Caudill-Tiseo Paving Company,Phone: 97 is 9-072 ' via E-mail:llCaudill @TiseoPaving.com Mr.Walter Mitchell-Tiseo Paving Company,via E- ' ob @yahoo.com Mr.Bobby Bounds-California Construction, Phone: i . ' -0 via E-mail: Bobby @CalConTex.com i Texas CMT, Inc. TBPE Firm: F-4521 Reviewed by: (7----2-4-1174-4--- All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Texas CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicativ f the quantities of apparently identical or similar products. i 7fj e 0 ai-