Loading...
Arbor Manors 4R2-CS120720 Rhonda Adloo From: Michael Garza Sent: Friday, July 20, 2012 4:14 PM To: Rhonda Adloo Subject: FW: Fire Lane Arbor Manors-Alternative Subgrade Attachments: nps7A64 MH 7.20.12.pdf Can you add this correspondence to the Arbor Manors retail file. Thanks, Michael Garza, P.E. Civil Engineer City of Coppell 972-304-7019 From: Michael Herrera j mailto:michael @hermansenlanddevelopment.comj Sent: Friday, July 20, 2012 11:10 AM To: Michael Garza Cc: Robb James (robb @mlgraypartnership.com); Kyle Hogue (Kyle @gacon.com); Lance Rose (lance @ncapartners.com); kirk hermansen Subject: Fire Lane Arbor Manors -Alternative Subgrade Michael, Per my voicemail, I would like to submit for review an alternative subgrade, which is supported by our Geotechnical Report, for your consideration. I have highlighted the relevant items in regards to the subgrade. 4.6.1 Pavement Subgrade Preparation Where rigid concrete pavement is used, lime stabilization of the subgrade soils will not be necessary and the pavement can be places on properly compacted subgrade. Please review and let me know if we can remove the lime stabilization due to the result of the Geotechnical Report. Thank you for your consideration. Michael Herrera Hermansen Land Development 5944 Luther Lane,Suite 725 Dallas,Texas 75225 Ph: 214-373-4202 x23 Cell: 972-951-5261 Fx: 214-373-0737 Em: michael@hermansenlanddevelopment.com Website: www.hermansenlanddevelopment.com 1 9. Trees in general, should not be planted closer to a structure than the mature height of the tree. A tree planted closer to a structure than the recommended distance may extend its roots beneath the structure, allowing removal of subgrade moisture and/or causing structural distress. 10. Utilities which project through slab -on -grade floors, particularly where expansive soils or soils subject to settlement are present, should be designed with some degree of flexibility and/or with a sleeve to reduce the potential for damage to the utilities should movement occur. 4.6 Pavement Recommendations 4.6.1 Pavement Subgrade Preparation The near surface soils at this site consist of sandy clay. Where rigid concrete pavement is used, iinie slabihzaliouu of the stibgrade soils wffl riot I)e uur.,ccssary and the pavement can be placed on properly compacted subgrade. It is our understanding that flexible (Asphalt) pavement sections are not planned. Initially, all topsoil including any deleterious materials must be removed from the areas proposed for pavement construction. After stripping and excavating to the proposed pavement subgrade level, and prior to placing fill, the exposed pavement subgrade should be proof -rolled with a tandem axle dump truck or similar rubber tired vehicle. Soils, which are observed to rut or deflect excessively under the moving load, should be undercut and replaced with properly compacted fill. The proof - rolling and undercutting activities should be witnessed by a representative of the geotechnical engineer and should be performed during a period of dry weather. The p venieuut suui)grade sofls should their be scare fled acid re conuiracled to ad least 95 pe cc rit of the standard IProcdor niax_inuuunu duy deull:idy AS "I "M IC69, iull the noisduuu °e u °anllge of oirdituuutu doer. abov�:e , oirdnnuuutu, for a depth of at least 6 iruches I)e1ow the suu:rface, After subgrade preparation and observation have been completed, fill placement if required may begin. The fill soils may consist of on -site or similar soils. The first layer of fill material should be placed in a relatively uniform horizontal lift and be adequately keyed into the stripped and scarified subgrade soils. Fill materials should be free of organic or other deleterious materials and have a maximum particle size less than 3 inches. Fill should be compacted to at least 95 percent of standard Proctor maximum dry density as determined by ASTM Designation D 698. Fill should be placed in maximum lifts of 8 inches of loose material and should be compacted within the range of optimum to 4 percentage points above the optimum moisture content value. The pavement subgrade at final elevation should be tested within 72 hours prior to placement of paving concrete. GTC Project No: 12G102 Page 9 of 11 4.6.2 Pavement Design The design thickness of a pavement will depend on the magnitude of axle loads and the number of load repetitions. Parking and drive areas will be constructed at locations around the building. Based on information provided, we understand that the parking areas will be subjected to normal daily traffic consisting of passenger automobiles only with occasional delivery and trash pick -up trucks limited heavy duty drive areas. Based on 20 year design life and computation based on AASHTO design methods the following pavement sections are recommended. Light Duty pavement sections are recommended for passenger vehicle parking areas and the Heavy Duty pavement sections are recommended for fire lanes, truck parking and drive areas. RIGID PAVEMENT DESIGN THICKNESS The concrete should have a minimum compressive strength of 3,500 psi at 28 days. The concrete should also be designed with 5 ± 1 percent entrained air to improve workability and durability. Proper finishing of concrete pavements requires the use of appropriate construction joints to reduce the potential for cracking. Construction joints should be designed in accordance with current Portland Cement Association guidelines. Joints should be sealed to reduce the potential for water infiltration into pavement joints and subsequent infiltration into the supporting soils. The design of steel reinforcement should be in accordance with accepted codes, Minimum reinforcement consisting of #3 bars placed at 18" centers is recommended. Large front loading trash dump trucks frequently impose concentrated front -wheel loads on pavements during loading. This type of loading typically results in rutting of the pavement and ultimately, pavement failures. Therefore, we recommend that the pavement in trash pickup areas and loading dock areas should consist of a minimum 7 -inch thick, reinforced concrete slab. 5.0 CONSTRUCTION CONSIDERATIONS It is recommended that GTC be retained to provide observation and testing of construction activities involved in the foundations and pavements, earthwork, and related activities of this project. GTC cannot accept any responsibility for any conditions, which deviated from those, described in this report, nor for the performance of the foundations and pavements if not engaged to also provide construction observation and testing for this project. The upper fine - grained soils encountered at this site may be sensitive to disturbances caused by construction traffic and changes in moisture content. During wet weather periods, increases in the moisture content of the soil can cause significant reduction in the soil strength and support capabilities. In addition, soils, which become wet may be slow to dry and thus significantly retard GTC Project No: 12G102 Page 10 of 11 Light Duty Heavy Duty Portland Cement Concrete 5.0 inches 6.0 inches (3500 psi) Subgrade or Subbase As Discussed Previously` The concrete should have a minimum compressive strength of 3,500 psi at 28 days. The concrete should also be designed with 5 ± 1 percent entrained air to improve workability and durability. Proper finishing of concrete pavements requires the use of appropriate construction joints to reduce the potential for cracking. Construction joints should be designed in accordance with current Portland Cement Association guidelines. Joints should be sealed to reduce the potential for water infiltration into pavement joints and subsequent infiltration into the supporting soils. The design of steel reinforcement should be in accordance with accepted codes, Minimum reinforcement consisting of #3 bars placed at 18" centers is recommended. Large front loading trash dump trucks frequently impose concentrated front -wheel loads on pavements during loading. This type of loading typically results in rutting of the pavement and ultimately, pavement failures. Therefore, we recommend that the pavement in trash pickup areas and loading dock areas should consist of a minimum 7 -inch thick, reinforced concrete slab. 5.0 CONSTRUCTION CONSIDERATIONS It is recommended that GTC be retained to provide observation and testing of construction activities involved in the foundations and pavements, earthwork, and related activities of this project. GTC cannot accept any responsibility for any conditions, which deviated from those, described in this report, nor for the performance of the foundations and pavements if not engaged to also provide construction observation and testing for this project. The upper fine - grained soils encountered at this site may be sensitive to disturbances caused by construction traffic and changes in moisture content. During wet weather periods, increases in the moisture content of the soil can cause significant reduction in the soil strength and support capabilities. In addition, soils, which become wet may be slow to dry and thus significantly retard GTC Project No: 12G102 Page 10 of 11 301., 303. 2290 CITY OF COPPELL DALLAS COUNTY, TEXAS