Loading...
Cambridge Phase 2-LR 970218J~] EOTECHNICAL ' GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: February 18, 1997 Date Concrete Placed: January 20, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase II O.K. Concrete Unknown Manhole Standard 6'x12" Area 28.27 Square Inches Concrete Report No.: 01 Project Number: 96-0298 MATERIALS s .... / ss[,B~tch wis. INSPECTION DATA Descriptiml (Lbs/CuYd) Mix Number: Time Sample Batched unknown Cement: 6 sk Time Sampled: unknown Sample Location: unknown Fly Ash: Track/Ticket No: unknown Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: unknown Concrete Range: unknown Fine Aggregate: Slump Range (inches): unknown Admixtures: Weather Conditions: unknown I Time Started: unknown 2 Time Completed: unknown Sample Air Content (%): unknown Added Water: unknown Total Cubic Yards Placed: unknown Required Strength (Lbs./sq.in.): unknown Sp~cira~n Measured Age Date To,al Load Compressive Strength Remark~ Number Slump (in.) (Day~) Tested (Lbs.) (Lb~./Sq.ln.) ECM 01 10 01/30/97 81,440 2,880 ECM 02 28 02/17/97 119,000 4,210 N/A ECM 03 28 02/17/97 121,480 4,300 Test Methods Utilized Fracture Regular ASTM C-31,C-39,C-143 (Unless Noled Otherwise) Cylinders Made By: Contractor Remarks and/or Distribution: CC: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell ~ Con~u].~:ant:8, Inc. Reviewed by, All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Co.sultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or impo:ted and are not necessarily indicative of t*~. ,~' apparently identical or similar products.