Cambridge Phase 2-LR 970218J~] EOTECHNICAL '
GEE Consultants, Inc.
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972
REPORT OF CONCRETE MIX INSPECTION
Report Date:
Client:
Project:
Contractor:
Concrete Supplier and Plant:
Location of Placement:
February 18, 1997 Date Concrete Placed: January 20, 1997
Beamer Development, Inc.
Estates of Cambridge Manor, Phase II
O.K. Concrete
Unknown
Manhole
Standard 6'x12"
Area 28.27 Square Inches
Concrete Report No.: 01
Project Number: 96-0298
MATERIALS s .... / ss[,B~tch wis. INSPECTION DATA
Descriptiml (Lbs/CuYd)
Mix Number: Time Sample Batched unknown
Cement: 6 sk Time Sampled: unknown
Sample Location: unknown
Fly Ash: Track/Ticket No: unknown
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambient Range: unknown
Concrete Range: unknown
Fine Aggregate: Slump Range (inches): unknown
Admixtures: Weather Conditions: unknown
I Time Started: unknown
2 Time Completed: unknown
Sample Air Content (%): unknown
Added Water: unknown Total Cubic Yards Placed: unknown
Required Strength (Lbs./sq.in.): unknown
Sp~cira~n Measured Age Date To,al Load Compressive Strength Remark~
Number Slump (in.) (Day~) Tested (Lbs.) (Lb~./Sq.ln.)
ECM 01 10 01/30/97 81,440 2,880
ECM 02 28 02/17/97 119,000 4,210
N/A
ECM 03 28 02/17/97 121,480 4,300
Test Methods Utilized Fracture Regular
ASTM C-31,C-39,C-143 (Unless Noled Otherwise) Cylinders Made By: Contractor
Remarks and/or Distribution:
CC:
Mr. Jack Bommarito - Beamer Development, Inc.
Mr. David Carlton - Dowdey Anderson Associates
Mr. Larry Davis - City of Coppell
~ Con~u].~:ant:8, Inc.
Reviewed by,
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Co.sultants, Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or impo:ted and are not necessarily indicative of t*~. ,~' apparently identical or similar products.