Loading...
Cambridge Phase 2-LR 970211EOTECHNICAL ENGINEERING E[ NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: February 11, 1997 Date Concrete Placed: January 31, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase 1I O.K. Concrete Pioneer/#27 Manhole Standard 6'x12~ Area 28.27 Square Inches Concrete Report No.: 02 Project Number: 96-0298 MATERIALS s ..... ! SSD Batch Wes. INSPECTION DATA Dnscriplion (Lbs/CuYd) Mix Number: 9339 Time Sample Batched Cement: 5 sk Time Sampled: Sample Location: Fly Ash: Truck/Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 79° Concrete Range: 70° Fine Aggregate: Slump Range (inches): Admixtures: Weather Conditions: Clear I Time Started: 1:45 pm 2 Time Completed: 5:15 pm Sample Air Content (%): 2% Added Water: 0 gallons Total Cubic Yards Placed: 8 Required Strength (Lbs./sq.in.): 3500 psi 3:10 pm 3:45 pm Allen & Deforest; Sount end of site 582~320910 Specimen Measured Age Date To~al Load Comprnssive Strength Remarks Number Slump (in.) (Days) Tested (Lbs.) (Lbs./Sq.ln.) ECM 04 7 02/07/97 90,440 3,200 ECM 05 28 02/28/97 5" ECM 06 28 02/28/97 EMC 07 H Hold Test Methods Ulilieed Fracture Regular ASTM C-31,C-39,C-143 (Unless Neaed Otherwise) Cylinders Made By: AJA Remarks and/or Distribution: CC: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton- Dowdey Anderson Associates Mr. Larry Davis - City of Coppell Reviewed by: ~'~~ All letters and reports are for tile exclusive use of the client to whom they arc addressed and shall not be reproduced without the full q',proval of GEE Consultants, Inc. The me of our nam~ must receive our prior wrltlen approval. Our letters and reporls apply only Io the sample lested aud/or impeclnd and are i~ol mcnssarily indicative of die quantities of appareully identical or similar products. -~ EOTECHNICAL E NGINEERING Ej NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: February 11, 1997 Date Concrete Placed: January 20, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase Il O.K. Concrete Unknown Manhole Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 01 Project Number: 96-0298 s .... / sso nat¢~ Wt~. INSPECTION DATA MATERIALS Mix Number: Time Sample Batehed unknown Cement: 6 sk Time Sampled: unknown Sample Location: unknown Fly Ash: Truck/Ticket No: unknown Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: unknown Concrete Range: unknown Fine Aggregate: Slump Range (inches): unknown Admixtures: Weather Conditions: unknown I Time Started: unknown 2 Time Completed: unknown Sample Air Content (%): unknown Added Water: unknown Total Cubic Yards Placed: unknown Required Strength (Lbs./sq.in.): unknown Sjgcill~ll Measured Age Date Tmal Load Convpressive SlrCll~t[! R~marks Numar Slump (in.) (Days) Tesled (L~.) (L~.~q.ln.) ECM 01 10 01/30/97 81,440 2,880 ECM 02 28 02/17/97 N/A ECM 03 28 02/17/97 T~sI Meth~s Otiliz~ Fracture ReguJar ASTM C-31,C-39,C-143 (Unless Noted Olhe~wise) Cyli~ers Made By: Co~tFactoF Remarks and/or Distribution: cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell ~E Consultants, Inc. All letters and reports are fro' the exclusive use of Ihe client to whom they are addressed n~d slmll not be reproduced wilhoUt the full approval of GEE Consultants. Inc. The use of our name must receive our prior written approval. Our letters and reports apply tuffy to the snmple tested and/or inspected and are not necessarily indicative of the quantities of apparently identical o~ similar products. EOTECH N I CAL E NGINEERING EJ NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: February 11, 1997 Date Concrete Placed: Feburary 3, 1997 Beamer Development, Inc. Estates of Cambridge Manor, Phase Il O.K. Concrete Pioneer///27 Inlet Standard 6"x12" Area 28.27 Square Inches Concrete Report No.: 03 Project Number: 96-0298 MATERIALS s ..... z ssD.atch w,~. INSPECTION DATA Description (Lbs/CuYd) Mix Number: 9339 Arrive Job: Cement: 5 sk Time Sampled: Sample Location: Fly Ash: Track/Ticket No: Coarse Aggregate: Temperature: Intermediate Aggregate: Ambient Range: 70° Concrete Rauge: 74' Fine Aggregate: Slump Range (inches): 4" Admixtures: Weather Conditions: Overcast 1 Time Started: 1:30 pm 2 Time Completed: 4:00 pm Sample Air Content (%): 4% Added Water: 10 gallons Total Cubic Yards Placed: Required Strength (Lbs./sq.in.): 3500 psi unknown 3:15 pm inlet, Southwest comer of site 547/321060 Specimen Measured Age Date Total L~ed Co~npressive Slreuglh Remarks Number Slump (in.) (Days) Tesled (Lbs.) (Lbs./Sq.ln.) ECM 08 7 02/10/97 112,200 3,970 ECM 09 7 02/10/97 111,300 3,940 4" ECM 10 28 03/03/97 EMC 11 28 03/03/97 Test Methods Utilized Fracture Regular Cylinders Made By: DF ASTM C-31,C-39,C-143 (Unless Noled Otherwise) Remarks and/or Distribution: cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell Consultants, Inc. Reviewed ^il lelters and reports are for file exclusive use of tim client lo whom they are addressed and shall uot be reproduced without the full approval of GEE Consultants, Inc. Tie use of our name must receive our pri~ written approval. Our letters and reports apply only lo the sample tested and/or inspected and are nol necessarily indicative of Ihe quantilies of apparently identical or similar products.