Loading...
GTE (Clear C2)-CS120727 T H E C I T Y O F COPPELL T 1 0 q X A S` , a July 27, 2012 Ken Key, Superintendent Preston General Contracting kenkey385@msn.com RE: GTE Shared Services, Lot 1 R1 B, Block 1 (Clear C2 Technology) Dear Mr. Key: A pre-construction conference on the referenced project has been scheduled for Thursday, August 2, 2012 at 9:00 a.m. in the Lobby conference room in Town Center at 255 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at (972) 304-3684. Sincerely, / ,/ - %?hL0- Larry i avis, Construction Inspector Office Phone: 972-304-3684 Fax: 972-304-3570 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Glenn Hollowell, P.E., Asst. Dir. of Public Works Keith Marvin, P.E., Project Engineer Michael Garza, P.E. Civil Engineer Michael Arellano, Chief Building Official Lee Stone, Commercial Building Inspector Tim Oates, Deputy Chief/Prevention 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 2 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner/owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner/owner representative's responsibility to notify the following parties: • Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) • Geotechnical firm • Project Engineer • Contractors or subcontractors for excavation, utility, & paving operations • SWPPP representative