July 27, 2012
Ken Key, Superintendent
Preston General Contracting
kenkey385@msn.com
RE: GTE Shared Services, Lot 1 R1 B, Block 1 (Clear C2 Technology)
Dear Mr. Key:
A pre-construction conference on the referenced project has been scheduled for
Thursday, August 2, 2012 at 9:00 a.m. in the Lobby conference room in Town Center at
255 Parkway Blvd.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab
and any other interested parties so that they may have a representative present. If you
have any questions concerning this project prior to the scheduled meeting, feel free to
contact me at (972) 304-3684.
Sincerely,
/ ,/ - %?hL0-
Larry i avis, Construction Inspector
Office Phone: 972-304-3684
Fax: 972-304-3570
cc: Ken Griffin, P.E., Dir. of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Dir. of Public Works
Keith Marvin, P.E., Project Engineer
Michael Garza, P.E. Civil Engineer
Michael Arellano, Chief Building Official
Lee Stone, Commercial Building Inspector
Tim Oates, Deputy Chief/Prevention
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
2
RESPONSIBILITY FOR PRE-CONSTRUCTION
MEETING NOTIFICATION
The owner/owner's representative will be notified of the date, time and place of
the pre-construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner/owner representative's responsibility to notify the following
parties:
• Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
• Geotechnical firm
• Project Engineer
• Contractors or subcontractors for excavation, utility, & paving operations
• SWPPP representative