Loading...
Arbor Manors 4R2-CS120727 T H E C 1 T Y O F COPPELL 4447,lr July 27, 2012 Richard Gray ML Gray Partnership, LLC 1811 Greenville Av, Ste 150 Dallas TX 75206 RE: Preconstruction Conference Notice Arbor Manors Retail Addition,Lot 4R2 Dear Mr Gray: A pre-construction conference on the referenced project has been scheduled for Tuesday, July 31, 2012 at 1:30 p.m. in the Lobby conference room in Town Center at 255 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at (972) 304-3685. Sin rel , Albert Samaniego Construction Inspector Office Phone: 972-304-3685 Fax: 972-304-3570 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Keith Marvin, P.E., Project Engineer Michael Garza, P.E., Civil Engineer Glenn Hollowell, P.E., Asst. Dir. of Public Works Lee Stone, Commercial Building Inspector Tim Oates, Deputy Chief/Prevention 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 2 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner/ owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner/owner representative's responsibility to notify the following parties: • Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) • Geotechnical firm • Project Engineer • Contractors or subcontractors for excavation, utility, & paving operations • SWPPP representative