Arbor Manors 4R2-CS120727 T H E C 1 T Y O F
COPPELL
4447,lr
July 27, 2012
Richard Gray
ML Gray Partnership, LLC
1811 Greenville Av, Ste 150
Dallas TX 75206
RE: Preconstruction Conference Notice
Arbor Manors Retail Addition,Lot 4R2
Dear Mr Gray:
A pre-construction conference on the referenced project has been scheduled for Tuesday,
July 31, 2012 at 1:30 p.m. in the Lobby conference room in Town Center at 255
Parkway Blvd.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab
and any other interested parties so that they may have a representative present. If you
have any questions concerning this project prior to the scheduled meeting, feel free to
contact me at (972) 304-3685.
Sin rel ,
Albert Samaniego
Construction Inspector
Office Phone: 972-304-3685
Fax: 972-304-3570
cc: Ken Griffin, P.E., Dir. of Engineering & Public Works
Keith Marvin, P.E., Project Engineer
Michael Garza, P.E., Civil Engineer
Glenn Hollowell, P.E., Asst. Dir. of Public Works
Lee Stone, Commercial Building Inspector
Tim Oates, Deputy Chief/Prevention
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
2
RESPONSIBILITY FOR PRE-CONSTRUCTION
MEETING NOTIFICATION
The owner/ owner's representative will be notified of the date, time and place of
the pre-construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner/owner representative's responsibility to notify the following
parties:
• Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
• Geotechnical firm
• Project Engineer
• Contractors or subcontractors for excavation, utility, & paving operations
• SWPPP representative