ST1002-CN120720 , • CITY OF COPPELL CHANGE OR EXTRA WORK ORDER Old Town Coppell and PROJECT: Bethel Road CONTRACTOR: JRJ Paving,L.P. OWNER: City of Coppell CHANGE ORDER NO.: Seven(7) DATE: July 20,2012 1. This change order provides for payment of some items that were not included in the original contract, but were necesarry for orderly completion of the project. 2. This change order provides for landscape screening and irrigation along Burns Street, as required per our development agreement. 3. This change includes the installation and removal of battery operated times to run the irrigation system while waiting for power service from Oncor. Item Description Quantity Unit Unit Price Total ADD: 1 Street name blades 24 EA $150.00 $3,600.00 2 Paint bridge rail 1 LS $4,740.00 $4,740.00 3 Structural concrete 3 CY $375.00 $1,125.00 4 Driveway culvert 25 LF $30.00 $750.00 5 6" Asphalt curb 197 LF $5.00 $985.00 6 Remove & replace inlet on 1 LS $3,698.85 $3,698.85 Hammond 7 8' - 10' Red Cedar 20 EA $288.75 $5,775.00 8 Irrigation system at Burns 1 LS $5,902.00 $5,902.00 Street 9 Battery operated times for 20 EA $150.00 $3,000.00 temporary irrigation. 249 Large Shade Tree - 9 EA $288.75 $2,598.75 Southern Live Oak Total Additions $32,174.60 CITY OF COPPELL CHANGE OR EXTRA WORK ORDER Total Deletions $0.00 Total Revision to Contract Amount: $32,174.60 Original contract amount $4,350,190.39 Net increase in contract amount $32,174.60 Previously approved changes $441,168.58 Revised contract amount $4,823,533.57 Cumulative increase in TOTAL change order amount(Percentage) 10.9% Net increase in contract time of completion 0 Revised Contract time of 350 Calendar Days completi on The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full Re •mmen.-d by City Engineer - Date 1 / Agreed to by Contr ctor P ate 92) 22_ Accepted b' City Date