Loading...
MA1001-CS120807 T H E C 1 T Y O F COPPELL a 4 X A S 1 8 August 7, 2012 Adrian Bowman Jim Bowman Construction Co. LP VIA CERTIFIED LETTER 2716 S. Rigsbee Dr. Plano, Texas 75074 RE: Notification of Repairs Needed Under Maintenance Bond MA 10-01 Denton Tap @ Sandy Lake Paver Replacement Dear Mr. Bowman: An inspection of the referenced project was conducted by the City of Coppell prior to the expiration of the two-year Maintenance Bond. The following item needs to be resolved prior to expiration of the bond on September 17, 2012: 1. Pavement striping has deteriorated severely at several locations and must be replaced. Please contact me at 972-304-7090 to inform me when your crew will be on the project to correct this deficiency. Sincerely, 71:644//// Rick O'Dell Construction Inspector cc: George Marshall, P.E., Civil Engineer Glenn Hollowell, P.E., Asst. Director of Public Works Per Birdsall, Streets Operations Manager 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673