SC-Coppell HS-CS 991123 (2) DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: PD-183, Coppell High School, a zoning change request from "C and SF-12"
Commercial and Single-Family-12 to "PD-C" Planned Development,
Commercial, to allow a 6' high decorative metal screening fence with
landscaping along the northern edge of the new parking lot, as well as
incorporate the previously approved site plan allowing the construction of
concession stands, a press box, additional seating at the existing football
stadium, as well as a multipurpose building, tennis court, tennis center, storage
facility and additional parking on property to this planned development to be
located at 185 W. Parkway Boulevard, at the request of Glenn Engineering,
Inc.
DRC DATE: November 23, 1999 and December 2, 1999
CONTACT: Mike Martin, P.E.,Assistant City Engineer(972-304-3679)
COMMENT STATUS: ✓PRELIMINARY FINAL REVISED
AFTER P&Z
1. No improvements will be allowed in the 100-year floodplain until you have an approved
flood study.