Loading...
Cambridge Phase 2-LR 970114EOTECHNICAL E NGINEERING EJ NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 9 (96-298) Method: ASTM D2922 D3017 D698 Page I of I Clielit: Bealner Developmellt, hie. Material Description Maximum Optimum Dry Moisture Density Coutcnt Project: Estates of Cambridge Manor, (Lbs/CuFf) Percent Phase Il 1. Light Reddish Brown Sand 118.9 10.0 2. Gray Shale with occasional Reddish Brown Sandy Clay 95.7 21.4 Test Date: January 14, 1997 3. Dark Gray nnd Yellowish Brown Clay with calcareous 100.6 20.0 nodules Report Date: January 17, 1997 Required Density (%): Min. 95% Required Moisture (%): opt +5% Mat Location/Elevation (and/or) Lift In-Place In-Place Percent No. Dry Density Moisture Compaction Test No. (Lbs/CuFt) Content (%) Probe Depth 3 Loth' 4; 3rd lilt; Final 28 Center of pad, Block B 95.7 20.0 95.1 6" 3 Lot# 3; 4th lift; Final 29 Center of pad, Block B 104.5 20.1 103.9 6" All tests meet project specifications cc: Mr. Jack Bo,nmarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell Our letters and reports are for tile exclusive use of tile client to whom they are addressed. The usc of our name must receive our prior written approval. Our letters aad reports apply only to thc sample tested aud/or inspected, and are not necessarily indicative of the quantities of apparently identical or similar products.