Loading...
Cambridge Phase 2-LR 970110EOTECHNICAL E' NGINEERING NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 8 (96-298) Method: ASTM D2922 D3017 D698 Page I of 1 Client: Beamer Development, IliC. Material Description Maximum Optimum Dry Moisture Density Content Project: Estates of Ca,nbridge Manor, (Lbs/CuFt) Percent Phase 11 1. Light Reddish Brown Sand 118.9 10.0 2. Gray Shale with occasional Reddish Brown Sandy Clay 95.7 21.4 Test Date: Jannary 10, 1997 3. Dark Gray aud Yellowish Browa Clay with calcareous 100.6 20.0 nodules Report Date: January 14, 1997 Required Density (%): Min. 95% Required Moisture (%): opt +5% Mat Location/Elevation (and/or) Lift In-Place In-Place Percent No. Dry Density Moisture Compaction Test (Lbs/CuFt) Content (%) No. Probe Depth 3 Lot// 1; 4th lift; Final 26 Center of pad 99.4 20.0 98.8 6" 3 Lot//2; 3rd lift; Final 27 Center of pad 99.8 21.3 99.2 6" All tests meet project specifications cc: Mr. Jack Bom~narito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell Our letters and reports are for thc exclusive use of the client to whom they are addressed. The use offer written approval. Our letters and reports apply only to the sample tested and/or inspected, and are not necessarily iudicative of the quantities of apparently identical or similar products.