Loading...
ST1002-CS120405 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-250R2-H, Old Town Addition (Main Street), Lot 2, Block E, a zoning change request from PD-250-H (Planned Development-250-Historic), to PD- 250R2-H (Planned Development-250 Revision 2 -Historic) to establish a Detail Site Plan/ Landscape Plan on Lot 2, Block E for a pavilion, fountain, play area and public restroom/ storage building on 1.53 acres of property located south of Houston Street and north of Travis Street between West Main and East Main Streets (all currently under construction), at the request of Brad Reid, City of Coppell, being represented by Bill Peck, William Peck & Associates Architects. STAFF REP.:PROJECT ID# PD-12-0010 Matt Steer DRC DATE: March 29, 2012 and April 5, 2012 CONTACT: Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. There may be additional comments during detailed engineering plan review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-250R3-H, Old Town Addition (Main Street) Entry Feature, Lot 1RX, Block B, a zoning change request from PD-250-H (Planned Development-250- Historic) to PD-250R3-H (Planned Development-250 Revision 3 -Historic), to establish a Detail Site Plan for an Entry Feature on 0.022 acres of property located at the southeast corner of Bethel Road and Main Street (under construction), at the request of Main Street Coppell, LTD being represented by Greg Yancey. STAFF REP.:PROJECT ID# PD-12-0011 Matt Steer DRC DATE: March 29, 2012 and April 5, 2012 CONTACT: Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. No comments DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Old Town Addition (Main Street) Blocks A thru E Replat, being a replat of Blocks A thru E into Block A, Lots 1R to 4R; Block B, Lots 1RX and 1R; Block C, Lots 1R to 6R; Block D, Lots 1R to 11R; and Block E, Lots 1R1, 1R2 & Lot 2, to establish lots, easements and an alley right-of-way on approximately 6.2 acres of property located South of Bethel Road, between Hammond Street and East Main Street (under construction), at the request of Main Street Coppell, LTD, being represented by Greg Yancey. STAFF REP.:PROJECT ID# RP-12-0012 Matt Steer DRC DATE: March 29, 2012 and April 5, 2012 CONTACT: Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. The 6’ access easement on Block E should be re-labeled a sidewalk easement. 2. Label all proposed easements. 3. Additional easements may be required based on final Engineering review. 4. Additional comments may be generated based on final review of Engineering plans. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-250R4-H, Old Town Addition (Main Street) Parking Lot, Lot 1R, Block A, a zoning change request from PD-250-H (Planned Development-250- Historic) to PD-250R4-H (Planned Development-250 Revision 4-Historic), to establish a Detail Site Plan for parking lot with 80 parking spaces on 1.067 acres of property located at the northeast corner of Hammond Street and Houston Street (under construction), at the request of Mindi Hurley, City of Coppell. STAFF REP.:PROJECT ID# PD-12-0013 Matt Steer DRC DATE: March 29, 2012 and April 5, 2012 CONTACT: Ken Griffin, P.E., Director of Engineering/Public Works 972-304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z No comments.