GTE (Clear C2)-CS120426
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
PD-171R3-HC, GTE Shared Services Addition (Clear C2 Office),
a zoning
change request from PD-171-HC (Planned Development-171-Highway
Commercial) to PD-171R3-HC (Planned Development-171 Revision 3-Highway
Commercial), to revise the Concept Site Plan on 9.74 acres of property and
attach a Detail Site Plan for a 11,077-square-foot office building on 2.09 acres
of property located on the north side of Canyon Drive, east of S.H. 121, at the
request of DFW Canyon Partners, LTD, being represented by John Taylor,
Azimuth Architecture.
STAFF REP.: Gary Sieb PROJECT ID# PD-12-0016
DRC DATE:
April 26, 2012 and May 3, 2012
CONTACT:
Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works 972/304-3686
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. Install stamped concrete at the driveways per city details
2. Additional Comments during detailed engineering plan review.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
GTE Shared Services Addition, Lots 1R1A & 1R1B, Block 1, Replat,
being
a replat of Lots 1R1 & 1R2 of the GTE Shared Services Addition, which
contains 9.74 acres of property, to establish a fire lane and utility easements to
support the development of a 11,077-square-foot office building on Lot 1R1B,
which contains 2.09 acres of property located on the north side of Canyon
Drive, east of S.H. 121, at the request of DFW Canyon Partners, LTD, being
represented by John Taylor, Azimuth Architecture.
STAFF REP.: Gary Sieb PROJECT ID# RP-12-0017
DRC DATE:
April 26, 2012 and May 3, 2012
CONTACT:
Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works 972/304-3686
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. The water easement should be 20’X15’
2. The drainage easement should be 20’.
3. The floodplain map number and date are not correct.