Loading...
Amberpoint 2R&3R-CS120426 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-194R4-LI, Amberpoint Business Park, Lots 2R & 3R, Block A (Avera), a zoning change request from PD-194R3-LI (Planned Development-194 Revision 3-Light Industrial) to PD-194R4-LI (Planned Development-194 Revision 4-Light Industrial), to attach a Detail Site Plan for a 300,800-square- foot office/warehouse building on 19.4 acres of property located on the east side of Northpoint Drive north of Wagon Wheel Park, at the request of Cabot Properties, Inc., being represented by Mike Meinhardt, Meinhardt & Associates. STAFF REP.: Matt Steer PROJECT ID# PD-12-0018 DRC DATE: April 26, 2012 and May 3, 2012 CONTACT: Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works 972/304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. There is a sag inlet near the middle driveway, you may want to consider moving the driveway. 2. Include stamped concrete at all the driveways per city details. 3. There may be additional comments during detailed engineering plan review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Amberpoint Business Park, Lots 2R & 3R, Block A (Avera), Replat, being a replat of Lot 2R3, Block A to Lots 2R & 3R, Block A, to establish a fire lane and utility easements to support the development of a 300,800-square-foot office/warehouse building on 19.4 acres of property located on the east side of Northpoint Drive, north of Wagon Wheel Park, at the request of Cabot Properties, Inc., being represented by B. Dave Littleton, Halff Associates. STAFF REP.: Matt Steer PROJECT ID# RP-12-0019 DRC DATE: April 26, 2012 and May 3, 2012 CONTACT: Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works 972/304-3686 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. 20’X20’ water easements are needed for both vaults. 2. Dimension the drainage easement as 20’.