Loading...
Bahama Beach Club-PT120810 T H E C !^T Y 0 F COPPELL„ . s-- ,f, 4- .',-:-.:",_-._- `4,..\ 7,,...e. .1's X n s a FLOODPLAIN DEVELOPMENT PERMIT PERMIT NO. 2 OJ 14 O r NAME OF PERMITEE: 6-0N-ii- 73 a.I a - --Ne-ov.0 cc_, 3 The above named permitee applied for a FLOODPLAIN DEVELOPMENT PERMIT on C/ t l) i I Z . The application has been reviewed by the FLOODPLAIN ADMINSTRATOR and it has been determined that the proposed development is located within an identifiable floodplain of: The FLOODPLAIN ADMINISTRATOR has reviewed plans and specifications of the proposed development for conformance with the development standards required by Floodplain Management Ordinance #2001-952. You are hereby authorized to proceed with the following described work: acs i—D th Dix& Dl%) —7 bt c F D L(,, h_ey,,t,L,Sbs' . To maintain compliance with the development standards of Floodplain Management Ordinance #2001-952 and to eliminate or minimize flood damage potential to the proposed development, you are hereby directed to construct your proposed development in accordance with the following special provisions: () Compliance with the development standards of Floodplain Management Ordinance #2001-952 including but not limited to: • For residential structures, the lowest floor (including basement) must be elevated to two (2) feet above the 100- year base flood elevation or one (1) foot above ultimate condition whichever is higher. Certification of the lowest floor must be submitted from a registered professional engineer, architect, or land surveyor. • For non-residential structures, the lowest floor (including basement) must be elevated or flood-proofed to two (2) feet above the 100-year base flood elevation or one (1) foot above ultimate condition whichever is higher. Certification that the flood-proofing methods are adequate to withstand the flood depths, pressure, velocities, impact and uplift forces and other factors associated with the base flood must be submitted from a registered professional engineer or architect. • For fill activities, the permittee must submit certification from a registered professional engineer or land surveyor that the level of the compacted fill materials is at or above the elevation of the Base Flood. () Certified copy of all final plans or As-Built Drawings must be submitted to the FLOODPLAIN ADMINISTRATOR. ( ) OTHER PROVISIONS: NO V A -113-0-ok og 1 10 1 I-2-Acknowiedgeme of Con ' tons by Permittee Printed Name Date Kz1” aq.%P.PiN 4• In.11- Sig ature of F PLAIN ADMINISTRATOR Printed Name Date Interior Area j 11 „II ,L I m N ri w 13„9 ,91 v tn • .EN 1 \ \ / - 11 R ”` / w /�3 „0 ,£ / o M 4 N �� 7 ti 11 „£ ,S I X I 11.,01 Z K 3 OT 2/1.1 / _ lJ L 1.,* Z,9.. m o0 it E CO 0 o / 11 „0 ,6 / r, cc al o , I O I `n o I la I ` ip v I / 4„9,9 / 11 „£ .17 14 I 8 a. 4= „O S I Ij I 4=1 I I I I II I I 4-4 I I uJ ett T 4-0 CU „6 — _ le, , . ` — __.__.I These NI.ns aFe not t be , • / 11 It th I tt u I p� 1j�_ g .s r<"c It pe - o f J {4Skge Q. IDes4 Th I! are tnn.dt p d Ih- 64 E 1 necessary build this structure B Id 0 - shall II si. r � " I vent), d check aspects g17 —? 4 l IP b t a h y z o f t:t ( u Designee's liability d jnrftt, b l� eyc e d f O=J! k q y �. a� x - plans HAND RAN" DRAWN EV'. Ell_ I DATE. 02 i;'0 -- .. ., ;CHECKED BY ,... . IDAT'E I RE'VISIGN 1 I .... BY ..-..-. .. .,-.. - ".-_ I DATE PREVISION 2 1131'. 'DATE. r _ _ - — HAND RAIL --. ___--/ i -HAND RAIL 1 — — — M. I Il A-3 __ 2 X 6 LAMINATED ® J w r HEADER J \ EXISTING STRUCTURE EXISTING STRUCTURE o — NO WORK IN THIS AREA --= -1 I NM 16 . __ItTt 1 i 7 1 , 1 _ __ .F. ,41..,, :4,_ —. — 1 , , , ..., , , , -- A-3 �2 X 6 LAMINATED o \ HEADER In --- 1 —lL Jl_ _ _S(______________ 7, 11111 I ,,, • , , . . _._ __ ____ 11 APPROX. LOCATION I - II OF WATER SHUT OFF I '� Ill � N ,ill _ N 0 C! N—� I' — l EXISTING COOLER T ^ ^ — _______ _DECK •le HIGH- t r-11 1/2" TO REMAIN I H I I — _ I;I ■ I' 1 I, 1_1_r I i t I i , \\I i___/ A-2 IIPI I I 1 yI-'1{," 1O'-0` T-6"► HAND RAIL FENCE l 7 -' , 41'_.5" J\ — BAR RAIL . - T \Y PUBLIC SQ. FOOTAGE: 2346 , S -) aD=—sa_' ,!__ a'—o° '— RESTROOM SQ. FOOTAGE: 225 C i s. I „ d_ 4–O" C CC 4'—zi s'—e 1/z' I OFFICE/STORAGE SQ. FOOTAGE: 220 I _) ml t 1..1 v 11 [ t �C any� TOTAL SQ. FOOTAGE: 2821 !°4 f7•f'/ 1 i. n' 1 r; a,— s �O ® V n c �t l e o � �! 1/A-8 4 1 4.1 h : -1 1 k ' t o i.;( rt 1'4 w l t aC , „� f t l�;' 4t 1t� Sr a fps l'f ii t� I k'.II 1 /� FLOOR PLAN `a 7 J'f 1 L r!iien a 1 xs – " — 1 LLi I;t I `< I I 'fl'I ii,.; .wt '_ "S Ir SCALE: 3/32" = 1' Ir 7 r A.1 i