Loading...
Cambridge Phase 2-LR 970107EOTECHNICAL E NGINEERING EI NVIRONMENTAL GEE Consultants, inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 7 (96-298) Method: ASTM D2922 D3017 D698 Page 1 of 1 Client: Beamer 'Development, Inc. Material Description Maximum Optimum Dry Moiature Density Content Project: Estates of Calnbridge Manor, (Lbs/¢uF0 Percent Phase II 1. Light Rcddisll Brown Sand 118.9 10.0 2. Gray Shale with occasional Reddish Brown Sandy Clay 95.7 21.4 : Test Date: January 7, 1997 3. Dark Gray and Yellowish Brown Clay with calcareous 100.6 20.0 nodules Report Date: January 8, 1997 {Required Density (%): Min. 95% Required Moisture (%): opt +5% Mat Location/Elevation (and/GO Lift la-Place In-Place Percent No. Dry Density Moisture Compaction Test (Lbs/CuFO Content (%) No. Probe Depth 3 Lot/l 1; 2nd lift; Block B 23 Center of lot 105.0 21.0 104.4 6" 3 Lot//3; 2nd lift; Block B 24 Center of lot 102.8 20.9 102.2 6" 3 Lot/t 4; 1st lift; Block B 25 Center of lot 105.6 21.3 105.0 6" All tests meet project specifications cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell Our letters and reports are for.the exclusive use of the client to whom they are addressed. The use of our nam~ muat rec~ive our prior written approval. Our letters and reports apply only to the sample tested and/or inspected, and are not necessarily indicative of the quantities of apparently identical or similar products.