Loading...
Cambridge Phase 2-LR 970106 (2)EOTECHNICAL GEE Consultants, inc. 10046 Monroe Drive · GENERAL REPORT Report Date: Client: Project: Dallas, Texas 75229 · (214) 352-5433 CANCELLATION/STANDBY January 6, 1997 Test Date: March 31, 1997 Beamer Development, Inc. General Report No.: 2 Estates of Cambridge Manor, Phase II Project No.' 96-298 Identification: Cancellation Fax (214) 352-69?2 Page 1 of 1 Results Scheduled time: Type of service scheduled: Time left lab: Time arrived at job: Time left job: Time returned to lab: Total Charged Time: 2:30 pm Concrete Mix Inspection 2:00 pm 2:30 pm 3:30 pm 4:00 pm 2 Hours Reason: Concrete was delayed. O.K. Concrete was left cylinder molds so that they could cast the cylinders on concrete arrival. Technician: GK CCi Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton o Dowdy Anderson Associates Mr. Larry Davis - City of Coppell All lelt~rs and reports are for the exclusive use of the client to whom lhey are addressed and shall not be reptdduced wilheut t~e full approval of GEE Consultants, Inc. The use of our name must receiveour prior written approval. Our letters and repo~s apply only to Ibe sample ~sl~d and/o~ inspecmi and are not necessarily indicative of the quantities of apparently idc~tlcsl or similar products. J EOTECHNICAL E NGINEERING NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 GENERAL REPORT CANCELLATION/STANDBY · Fax (214) 352-6972 Report Date: Client: Project: Identification: January 6, 1997 Test Date: Beamer Development, Inc. General Report No.: Estates of Cambridge Manor, Phase 1I Project No.: Cancellation January 2, 1997 1 96-298 Page 1 of 1 Results Scheduled time: Type of service scheduled: Time left lab: Time arrived at job: Time left job: Time returned to lab: Total Charged Time: Reason: Site was not ready. 9:30 am Den 9:00 am 9:30 am 9:45 am I0:15 am 2 Hours Technician: D.F. CC: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdy Anderson Associates Mr. Larry Davis - City of Coppeli All le~rs and reports are for the exclusive use of the cliem to whom Ihey are addressed and shall not be reproduced without Ihe full approval of GEE C~multare, In~. ~ us~ of our name must recciveour prior written approval. Our letters and relxmS apply only lo ~he sample tested and/or inspected and are not necessarily indicative of the quantities of apparently idemical or similar products.