ST1002-PH120817 HOME • AUGUST 17; 2012 n,.,.
(X)N$TRIJCTION 1)IARY
August,-2012
• ends the diary of a construction site, to for residents of all ages.
As the road construction in Old Coppell comes to a close, its new Main Street
1" (below)is complete with traffic and crosswalk lights, and.angled parking spaces.
•. Kt, ""m1141111
Haley Moore
et\ ,
• €
�cx
0,� 4.= 3 ,
�
Or-, :I;v`' L ,• "fir .
a gffi
t Y
�+\
1.._