Loading...
Cambridge Phase 2-LR 970104EOTECHNICAL E NGINEERING El NVIRONMENTAL GEE Consultants, Inc. 10046 Monroe Drive Dallas, Texas 75229 · (214) 352-5433 * Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 5 (96-298) Method: ASTM D2922 D3017 D698 Page 1 of 1 Client: Beamer Development, Inc. Material Description Maximum Optimum Dry Moisture Density Content Project: Estates of Cambridge Manor, Phase (Lbs/CuF0 Percent II 1. Light Reddish Brown Sand 118.9 10.0 2. Gray Shale with occasional Reddish Brown Sandy Clay 95.7 21.4 Test Date: January 4, 1997 3. Dark Gray and Yellowish Brown Clay with calcareous 100.6 20.0 nodules Report Date: January 7, 1997 Required Density (%): Min. 95% Required Moisture (%): opt +5% Mat Location/Elevation (and/or) Lift In-Place In-Place Percent No. Dry Density Moisture Compaction Test (Lbs/CuF0 Content (%) No. Probe 3 Subgrade; Lot//4; 5th Lift; Block A 17 Center of lot 105.7 21.7 105.0 6" 3 Subgrade; Lot//5; 4th Lift; Block B 18 Center of lot 104.8 20.0 104.2 6" All tests meet project specifications cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell Our letters and reports are for the exclusive u~e of the client to whom they are addressed. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or inspected, and are not necessarily indicative of the quantities of apparently identical or similar products.