Loading...
Big Cedar-CS 911126 ILE COi: i GOODWIN ARSHALL CIVIL ENGINEERS ~ PLANNERS ~ SURVEYORS November 26, 1991 Ms. Shohre Daneshmand, P.E. Engineering Department City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 HO¥ 2 6 t99t BY:. Engineering RE: Clearing and Grubbing of the Big Cedar Addition, Coppell, Texas Dear Shohre: On behalf of my client, I would like to formally request that we be allowed to initiate clearing and grubbing operations on the above referenced project. This office has coordinated this operation with Mx. Larry Davis and Mx. Gary Hendricks. Based on this coordination, we plan to initiate cleating and grubbing activities immediately. Please contact me is this causes any problems. The following parties are involved in the clearing and grubbing as shown: Owner: Carmen and Street, a Texas General Partnership Mx. Roy Brock 200 E. Beltline Road Coppel, Texas 75019 (214) 461-1723 Contractor: Cooper Construction Mr. Wesley Cooper 3229 Flowcrdalc Dallas, Texas 75229 (214) 993-8881 Goodwin and Marshall, Inc. MX. D. Matthew Goodwin, P.E. 6001 Bridge Street, Suite 100 Fort Worth, Texas 76112 (817) 4294373 Enclosed please fred a copy of the receipt and check number for the construction inspection fee for the Big Cedar project. Finally, the owner of the project understands that he maintains responsibility for any drainage or traffic problems that occur resulting from this cleating and grubbing operation. 6001 BRIDGE STREET, SUITE 100 / FORT WORTH, TEXAS 76112 / 817-429-4373 (METRO) Ms. Shohre Daneshmand, P.E. November 26, 1991 Page 2 of 2 I appreciate your cooperation in this matter. If you have any questions or comments, please do not hesitate to call D. Matthew Goodwin, P.E. DMG/jc CC: Mr. Larry Davis Mr. Tim House November 12, 1991 NOU 25 '91 16:07 1006 CARMEN & STREET ' ~ GENERAJ. PARTNERSHIP ~I~11~ Mr. Alan Johnson Assistant Finance Director City of Coppell P. O. Box 478 Coppell, Texas 75019 Re: Big Cedar Add/tion Development Fee Assessment Dear Mr..,rohnson: Please find submitted herewith a check in the amount of $53,066.72, which is the development fee calculated for thc referenced development. This fee consists of the following: $47,829.36 per City lette~ dated October 21, 1991 (copy attached) 5,237.36 construction inspection fee of 2% of engineer's estimated development cost (Copy attached') ............ $53,066.72 Total Should you have any questions regarding this matter, please contact me. Sincerely, MATTHEWS SODWHWEST Tim House Vice President