August 21, 2012
Robert Farrow
CPS Civil,LLC
1215 Crest Lane Drive
Duncanville TX 75137
RE: Sales Tax 2011B,Vanbebber Drive Reconstruction
Dear Mr. Farrow:
The contract for the above-referenced project was awarded to your firm at the August 14, 2012 City
Council meeting. Enclosed with this letter are three original contract documents. Please sign the
documents where indicated, provide the required bonds to be inserted in the contracts and return all
three originals to me. One of the originals will be returned to you for your file after its execution by
the City.
A preconstruction conference for this project will be scheduled after we receive the executed
documents. The inspector for the project will be Rick O'Dell. If you have any questions or need any
assistance Rick can be reached at 972/304-7090.
Sincerely,
Keith Marvin, P.E.
Project Engineer
Office: 972-304-3681
Fax: 972-304-3570
kmarvi n@coppelltx.gov
cc: Rick O'Dell, Construction Inspector