Loading...
Tax 2011B-CS120821 T H E C 1 T Y O F COPPELL A' A s 1 s August 21, 2012 Robert Farrow CPS Civil,LLC 1215 Crest Lane Drive Duncanville TX 75137 RE: Sales Tax 2011B,Vanbebber Drive Reconstruction Dear Mr. Farrow: The contract for the above-referenced project was awarded to your firm at the August 14, 2012 City Council meeting. Enclosed with this letter are three original contract documents. Please sign the documents where indicated, provide the required bonds to be inserted in the contracts and return all three originals to me. One of the originals will be returned to you for your file after its execution by the City. A preconstruction conference for this project will be scheduled after we receive the executed documents. The inspector for the project will be Rick O'Dell. If you have any questions or need any assistance Rick can be reached at 972/304-7090. Sincerely, Keith Marvin, P.E. Project Engineer Office: 972-304-3681 Fax: 972-304-3570 kmarvi n@coppelltx.gov cc: Rick O'Dell, Construction Inspector 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673