Loading...
Cambridge Phase 2-LR 961231EOTECHNICAL E NGINEERING E J NVIRONMENT^L GEE Consultants, Inc. 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF IN'PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 3 (96-298) Method: ASTM D2922 D3017 D698 Page 1 of 1 Client: Beamer Development, Inc. Material Deicription Maximum Optimum Dry Moisture Density Content Project: Estates of Cambridge Manor, Phase (Lbs/Curt) Percent II 1. Light Reddish Brown Sand 118.9 10.0 2. Gray Shale with occasional Reddish Brown Sandy Clay 95.7 21.4 Test Date: December 31, 1996 3. Dark Gray and Yellowish Brown Clay with calcareous 100.6 20.0 nodules Report Date: January 7, 1997 Required Density (%): Min. 95% Required Moisture (%): opt +5% Mat Location/Elevation (and/or) Lift in-Place In-Place Percent No. Dry Density Moisture Compaction Test (Lbs/Curt) Content (%) No. Probe Depth 3 Lot//3; 2nd Lift; Block A 12 Center of lot 97.6 26.3 97.0 6" 3 Lot//4; 1st lift; Block A 13 Center of lot 98.5 26.1 97.9 6" All tests meet project specifications cc: Mr. Jack Bommarito - Beamer Development, Inc. Mr. David Carlton - Dowdey Anderson Associates Mr. Larry Davis - City of Coppell Our letters and reports are for the exclusive use of the client to whom they are addressed. TI/e use OVrO~ name must receive our prior written approval. Our lelters and reports apply only to the sample tested and/or inspected, and are not necessarily indicative of the quantities of apparently identical or similar products.