Loading...
Big Cedar-CS 911118SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225 (214) 361-7900 ROSS L. JACOBS, P.E. I. C. FINKLEA, P.E. JAMES E. LAUGHLIN, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. MATT ARMSTRONG, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. C. L. SHIMEK, P.E. November 18, 1991 Re: Bid Cedar Addition Final Plat & Plans - 3rd Review Dear Ms. Daneshmand: We have reviewed the final plat and construction plans of the Big Cedar Addition to the City of Coppell prepared by Goodwin and Marshall, Inc. for Mathews Investments Southwest, inc. The following items should be resolved prior to final acceptance of this addition: 1) A 30-foot sanitary sewer easement was requested along the back of Lots 9 - 12 for a future 15-inch sanitary sewer. The plat provides for a 20- foot easement. Our review of the grading plan found that at no point is the top bank of the finished pads of Lots 9 - 12 closer than 40 feet to the back property lines. Therefore, the entire 30-foot easement requested will be within the 3:1 side slope portion of the fill section, an area that is not usable for the homeowners. We recommend the 30-foot width easement be included on this plat. 2) The final plat should clearly indicate the limits of the fully developed 100-year flood plain and provide for a floodplain easement. This includes the limits of the floodplain within Lot 42 which is identified as Parkland Dedication 3) In order to facilitate the projects identified in the City Wide Storm Water Management Plan, a 10-foot wide drainage easement will be required along the back of Lot 16. Ms. M. Shohre Daneshmand, P.E. City of Coppell November 18, 1991 Page No. 2 4) The reclamation and lot grading plan indicates a 2:1 side ~ope for the fill section on Lots 4 & 5. We recommend 4:1 as the desir~le maximum and 3:1 as the absolute maximum side slope. See Article~, Section D.9.b. - Site Grading of the Floodplain Ord. No. 87390. The reclamation and lot grading plan should show proposed on site contours and transi- tions back to existing contours along with limits on the proposed 100- year flood. 5) As we have mentioned in previous review comments, Harris Road Improve- ments are not a part of this project. Again, we recommend that no building permits be issued until Harris Road is improved to City Standards and accepted by the City. 6) The plat indicates that Harris Road south of this addition is to be abandoned by the City and the right-of-way is to revert to the adjacent property owners. The City of Coppell has an existing 8-inch water line within the Harris Road right-of-way and will require an easement to maintain the line. The necessary documents should be submitted, reviewed and filed for record concurrently with this plat. 7) It is our understanding that staff is recommending an alley behind Lots 37 - 41. This has not been provided. 8) It is our understanding that the development fees for this project has been received. Please provide us with a copy of the paid receipts for our files. Please forward these comments along with the enclosed marked up review sets to the Public Works, DRC Members for their review. We are available to discuss this project further at your convenience. Enclosure cc: Mr. Gary Sieb Public Works, DRC Members Goodwin and Marshall, Inc. Sincere,/ i Ga~¥ C.| ~endrfcks, P.E.