Loading...
Bellacere Addn-CS120827 T H E C I T Y 0 F COPPELL ,e.. ---. 4 7, 0„pci,- * 2. — ,:,-_,,,...,,,, , ,,,,,___ __ , August 27, 2012 Tommy Cansler Timberland Creek Companies 3930 Glade Rd, Ste 108-322 Colleyville TX 76034 RE: Bellacere Addition PRE-CONSTRUCTION MEETING Dear Mr. Cansler: A pre-construction conference on the referenced project has been scheduled for Tuesday, September 4, 2012 at 10:30 a.m. in the second floor conference room in Town Center at 255 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at (972) 304-7090. Sincerely, i Rick O'Dell, Construction Inspector Office Phone: 972-304-7090 Fax: 972-304-3570 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Glenn Hollowell, P.E., Asst. Dir. of Public Works Michael Arellano, Chief Building Official Mike Hodge, Residential Building Inspector Tim Oates, Deputy Chief/Prevention 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner/ owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner/owner representative's responsibility to notify the following parties: • Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) • Geotechnical firm • Project Engineer • Contractors or subcontractors for excavation, utility, & paving operations • SWPPP representative