Bellacere Addn-CS120827 T H E C I T Y 0 F
COPPELL
,e.. ---. 4 7, 0„pci,- *
2. — ,:,-_,,,...,,,, , ,,,,,___ __ ,
August 27, 2012
Tommy Cansler
Timberland Creek Companies
3930 Glade Rd, Ste 108-322
Colleyville TX 76034
RE: Bellacere Addition
PRE-CONSTRUCTION MEETING
Dear Mr. Cansler:
A pre-construction conference on the referenced project has been scheduled for Tuesday,
September 4, 2012 at 10:30 a.m. in the second floor conference room in Town Center at
255 Parkway Blvd.
Please notify the franchised utility companies, contractors, sub-contractors, testing lab
and any other interested parties so that they may have a representative present. If you
have any questions concerning this project prior to the scheduled meeting, feel free to
contact me at (972) 304-7090.
Sincerely,
i
Rick O'Dell, Construction Inspector
Office Phone: 972-304-7090
Fax: 972-304-3570
cc: Ken Griffin, P.E., Dir. of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Dir. of Public Works
Michael Arellano, Chief Building Official
Mike Hodge, Residential Building Inspector
Tim Oates, Deputy Chief/Prevention
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
RESPONSIBILITY FOR PRE-CONSTRUCTION
MEETING NOTIFICATION
The owner/ owner's representative will be notified of the date, time and place of
the pre-construction meeting once it is scheduled by the Construction Inspector
assigned to the project.
It is the owner/owner representative's responsibility to notify the following
parties:
• Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
• Geotechnical firm
• Project Engineer
• Contractors or subcontractors for excavation, utility, & paving operations
• SWPPP representative