Loading...
WA0602-CN120709TO: Clay Phillips, City Manager VIA: Kenneth M. Griffin, P.E., Director of Engineering/Public Works FROM: Keith R. Marvin, P.E., Project Engineer DATE: July 9, 2012 RE: Consider award of a drainage improvements and water service replacement (WA06-02) project in the amount of $32,350 to Canary Construction, Inc.; as provided in DUD funds. Over the last two weeks engineering staff has met with several contractors to solicit pricing for the referenced project. We received three quotes ranging from $32,350.00 to $65,165.00. The lowest price was from Canary Construction, based here in Coppell. This project consists of the extension of 272 feet of storm drain line, the installation of two inlets, and the abandonment of an old 2" water line. This work is being done in the Stringfellow Addition south of Sandy Lake Road, west of Moore Road. See the attached exhibits for more detail on the location and scope of work. City staff has been working towards the resolution of two problems in this area since 2006. The first problem is the existence of the old 2" water line. This line previously fed as many as four homes in the area, however due to redevelopment it now serves only one home at 117 S. Moore. This project will eliminate this line and put a new service under Moore Road to serve the existing home. The other problem is drainage. The construction of Nash Manor southwest of this location, and the redevelopment of the properties surrounding 117 S. Moore have strained the drainage ditch along the west side of this property. When the Nationwide Insurance building was Constructed in 2006 we had them extend a drainage pipe to their south property line to try to pick up this water, with limited success. This project will extend an 18" drainage pipe 272 feet to pick up the balance of the water. Canary Construction has done work both in and for the City of Coppell previously. They have the equipment and personnel to complete this project, and we recommend award of this contract to them in the amount of $32,350. 4" m. V Canary Construction Inc. 523 Greenwich Date: 07-03-2012 Coppell, Texas 75019 Office: 469-464-3823 City of Coppell Cell: (214) 549-8738 Email; waynecanary@gmaii.com Stringfellow Addition Item # Description Quantity Unit Unit Price Unit Total Storm Drain 1 18" HDPE 272 Linear Feet $ 65.00 $ 17,680,00 2 Connect to Existing 30" RCP I Each $ 500.00 $ 500.00 3 2 FT Drop Inlet 2 Each $ 2,800.00 $ 5,600.00 4 Grass Seed 1 Lump Sum $ 1,500.00 $ 1,500.00 Water Service 5 3/4 Inch Water Service 1 Each $ 3.500.00 $ 3,500.00 6 Meter Can 1 Each $ 350.00 $ 350.00 7 1" PVC Water Line 1 Each $ 2,500.00 $ 2,500.00 8 Remove & Replace Pavement 18 Sq. Feet $ 40.00 $ 720.00 Canary Construction, Inc, Date Signature 'Z Print Name Wayne Borstad Title President Total $ 32,350.00 Accepted by: City of Coppell Texas Date )11�,12- ,Si nature Print Name /Z-7/z" FOUr Star Excavating, Co. po. Box z7ns s Dallas, Texas 7s227 Office: (972)-330-6767 * Fax: (97z) 4az'z597 Project: STR NGFELLOVVADDDlON Location: COPPELL Date: 6/29/2012 We propose to provide equipment, labor and material to perform the following operations. Our proposal isto include these items as specifically listed, all other work items ur materials are excluded. This quote is void after thirty days from proposal date. Item No. Item Description Qty U/M Unit Price Extension WATER 1 1" COPPER WATER SERVICE 1 EA $ 3,700.00 $ 3,700.00 3 REMOVE EX. SERVICE LINE 37 LF $ 17.00 $ 629.00 5 ABANDON 2" GATE VALVE 1 EA $ 300.00 $ 300.00 10 TRAFFIC CONTROL 1 LS $ 500.00 $ 500.00 STORM Exclusions: ' Inspection Fees General building permit ' Impact, tap or connection fees Construction Material Testing 'GecteohTesting Sincerely, Antonio Evangelista Four Star Excavating Co. Grand Total : $ 35,237.00 'Meter fees and/or deposits Conduits or sleeves for other trades Sodding Tree replacement - Locate Of Private Utilities Job Name: STRINGFELLOW ADDITION 71912012 Location: COPPELL, TX 6:47 AM Bid Date: 6-Jul-12 Bid Time: 2,00 PM Item Description Bid Old No. Q!y Unit Unit Amount BASE BID 0,00 0.00 0.00 0.00 MOBILIZATION 1 LS 4,500.00 4,500.00 RMV / RPLC CONC PAVEMENT 12 SY 120.00 1,440.00 CNCT TO EXISTING WATER LINE (3/4"X 8") 1 EA 750,00 750.00 MISSLE 314" TYPE K COPPER TO NEW METER 45 LF 55,00 2,475.00 INSTALL NEW METER BOX / SRVC (MTR PROVIDED BY OTHERS) 1 EA 500.00 500.00 314" POLY WATER SERVICE LINE 175 LF 30.00 5,250.00 CNCT TO EXISTING WATER LINE (314' X 314") 1 EA 350.00 350.00 CUT & PLUG EXISTING 2" WATER LINE 1 EA 500.00 500.00 INSTALL 18" HOPE STORM PIPE 300 LF 100,00 30,000.00 INSTALL 2' DROP INLET 2 EA 3,000.00 6,000m CNCT 18" HDPE TO EXIST 30" RCP 1 EA 1,000,00 1,000,00 RMV I R PLC FENCE 20 LF 50,00 1,000,00 CLEARING & GRUBBING (MOVING MISC ITEMS AROUND PROPERTY) I LS 3,000.00 3,000.00 INSTALL BLOCK SOD (AT WATER LINE ONLY) 100 SY 10.00 1,000.00 RMV I RPLC GRAVEL DRIVEWAY (TO INSTALL WATER LINE) 80 SY 55.00 4,400,00 TRAFFIC CONTROL I BARRICADES I LS 1,500m 1,500.00 SURVEYI LAYOUT I LS 1,500.00 1'500.00 0.00 0,00 TOTAL BID AMOUNT $ 65,165.00 0.00 0.00 0.00 0.00 NOTES: MATERIAL TESTING BY OTHERS 0,00 0.00 0.00 0.00 NTC NOT RESPONSIBLE FOR TREES THAT NEED TO BE REMOVED. 0.00 0.00 NTC WILL TRY TO KEEP ALL TREES, BUT SOME ARE EXTREMELY CLOSE 0.00 0.00 TO THE PIPE AND MIGHT DIE WHEN DIGGING SO CLOSE TO THEM. 0.00 0,00 0.00 0.00 NO TV INSPECTION OF STORM PIPE INCLUDED 0.00 0.00 0.00 0.03 NO TRENCH SAFETY PLAN INCLUDED 0.00 0.00 0.00 0.00 NO IRRIGATION LINE REPAIRS OR RELOCATIONS INCLUDED 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0,00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Canary Construction Inc. 523 Greenwich Date: 07-03-2012 Coppell, Texas 75019 Off ice: 469-464-3823 City of Coppell Cell: (214) 549-8738 Email: waynecanary@gmaii.com Stringfellow Addition Item # Description Quantity Unit Unit Price Unit Total Storm Drain 1 18" HDPE 272 Linear Feet $ 65.00 $ 17,680.00 2 Connect to Existing 30" RCP 1 Each $ 500.00 $ 500.00 3 2 FT Drop Inlet 2 Each $ 2,800.00 $ 5,600.00 4 Grass Seed I Lump Sum $ 1,500.00 $ 1,500.00 Water Service 5 314 Inch Water Service 1 Each $ 3,500.00 $ 3,500.00 6 Meter Can 1 Each $ 350.00 $ 350.00 7 1" PVC Water Line 1 Each $ 2,500.00 $ 2,500.00 8 Remove & Replace Pavement 18 Sq. Feet $ 40.00 $ 720,00 Canary Construction, Inc, Date Signature Print Name Wavne Porstad Title President Total $ 32,350.00 Accepted by: City of Coppell Texas Date Sianature "', "41 Print Name Z-,/, Title Form �V.q Request for Taxpayer (Rev, October 2007) Identification Number and Certification Noartment Of intemal Aever%,1ht-Tw(i=oUq- M na vs 0 02 CL Q. 03 Ql U) Name (as shown on ymr income W return) Canary Construction Inc Sus}ness name, it different from above Check appropriate box: El IrclividuaVSole proprieto, S Corporation Ll Partnership Limited liability company. Enter the tax dassification Qzdisregardod entity, C�corperajjon' payec- Other (see instructions) 11- 523 Greenwich Lane City, state, and ?JP code Coppelf, TX. 75019 list account numberis) here (optional) Enter your TIN in the appropriate box. The 71N provided must match the name given on Une 1 to avoid backup withholding. For individuals, this is your social security number (SSM. However, for a resident alien, sole proprietor, or disregarded entity, see the Part I Instructions on page 3. For other entities, It is your employer Identifitcation number (EIN). If you do not have a number, see How to got a TIN on page 3. or Note. If the account is In more than one name, see the chart on page 4 for guidelines on whose �Emplciyrer identification number number to enter. L 75 j 2922071 General Instructione otherwise noted. NM=�� W. No. 10231X Form W-9 (Rev, 10-2007) FORM CIQ For vendor or other person doing business with local governmental entity This questionnaire is being filed in accordance with chapter 176 of the Local OFFICE Government Code by a perSOD doing business with the governmental entity. ONLY I IP I = RM t MMY Matl XIC ItIl UViItWb�i 11dj MMY LIM UUM AIC pultilut-c 5 aware of facts that require the statement to be filed. See Section 176.006, Local Government Code. U1 3M Eli ■ Check this box if you are Ming an update to a previously filed questionnaire. Name each local government officer who appoints or employs local government officers of the 0 governmental entity for which this questionnaire is filed AND describe the affitiation or busine relationship. I CONFLICT OF INTEREST QUESTIONNAIRE Page 2 5 Name of local government officer with whom fifer has affiliation or business relationship. (Complete this section only if the answer to A, B, or C is YES. This section, item 5 including subparts A, B, C & D, must be completed for each officer with whom the filer has affiliation or other relationship. Attach additional pages to this form CIQ as necessary, A. Is the local government officer named in this section receiving or likely to receive taxable income from the filer of the questionnaire? ❑ Yes ❑ No B. Is the filer of the questionnaire receiving or likely to receive taxable income from or at the direction of the local Xo ernment officer named in this section AND the taxable income is not from the local govrmmental entity.) LJ Ycs r NO C- Is the filer of this questionnaire affiliated with a corporation or other business enti That thll cal government officer serves as an officer or director, or holds an ownership of 10 percent Yes )2&'No .1 . D- Describe each affiliation or business relationship, Signature 0 n doing business & ith the govemmental entity 04W