Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Villas at LV-CS120904
DEVELOPMENT FEE WORKSHEET PROJECT: Villas at Lake Vista, Phase One DATE: 5/17/2005 S Water Impact Fee: g Domestic Meter(s): 93 - 5/8 inch X 3/4 inch = 93 ESU's g V 1 - 2 inch = 8 ESU's I Irrigation Meter(s): 4 -2 inch = 32 ESU's 0 = 0 ESU's Fireline Meter(s): 0 = 0 ESU's rJ�2- 7 Total#: 133 ESU's @ S280.00 ea. X/ , 2-4s-0 437-721077t (Due prior to issuance of building perms' Water Tap Inspection Fee: Total #: 98 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total it 93 1"Domestic Meter(s) @("*1 $60.52 $5,. :.36 1 Additional Domestic Meter(s) @ $211.72 • 11/2 (Single family due prior to issuance of building permit) G6 -� 6)" (All other developments due prior to issuance of/meter) Irrigation/Fireline Water Meter Fee: / ?2 g- 7(2 , c) a Total #: 4 Irrigation Meter(s)@ $211.72 Total #: 0 Additional Irrigation Meter(s) © $0.00 $0.00 Total #: 0 Fireline Meter(s)@ $0.00 $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 94 Meter(s) © $30.00 ea. $2,820.00 (100% due prior to issuance of water meters) lid Irrigation/Fire Meter Deposit Fee: Total #: 4 Meter(s) @ $30.00 ea. $120.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 101 © $280.00 ea. $ ,280.00 (Due prior to issuance of building permit) ' ij-c) Wastewater Tap Inspection Fee: Total #: 94 Connections @ $50.00 ea. $4,700.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (AH developments): Total #: 94 Lots© $50.00 ea. $4,700.00 (100% due prior to issuance of building permit) il<° Page 1 ;'3 d 7 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat appros ed: After October 20. 1993 Park Development Zone : Zone 2 93 Single-family @ $1.285.00 per lot $119,505.00 0 Multi-family @ $1.285.00 per unit $0.00 (100% paid prior to Council approval of final plat) Roadway impact.Fee: (See attached fee calculations) $79,515.00 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Information not Available This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Information not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Information not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) '*•The use of 1"meters is required for fire protection, however, impact fees are being assessed for 3/4"domestic meters. Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: 17llas at Lake I ista,Phase One DATE: 5/17/2005 ROADWAY IMPACT FEE: Service Area * 2 Category ** Residential Land Use *1' Residential Others Not Specified No. I.ots't nits 93 Development l nits ** 93.00 Vehicle Miles per Development t'nit** 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due - (Development Units)x (Vehicle Miles per Development Unit)x(Fee per Vehicle Mile) $79,515.00 * (Figure 2- Roadway Impact Fec Study) F* ('Table 3 - Roadway Impact Fcc Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) AMOUNT J)UEr • :•• • -579,5::1`5;O0