Carter Ph 1 FS-CS 990527 Federal Emergency Management Agency
Washington, D.C. 20..472
May 27, 1999
Mr. Robert L. Wright, P.E. IN REPLY REFER TO:
Vice President Case No.: 99-06-734P
Needham Wright Engineers, Inc. Community: City of Coppell, Texas
10290 Monroe Drive, Suite 101 Community No.: 480170
Dallas, TX 75229
316--ACK. FRQ
Dear Mr. Wright:
This responds to your letter dated May 21, 1999, concerning a February 10, 1999, request that the Federal
Emergency Management Agency (FEMA) issue a revision to the Flood Insurance Rate Map (FIRM) for
the above-referenced community. Pertinent information about the request is listed below.
Identifier: Carter Addition
Flooding Source: Grapevine Creek
FIRM Panel(s) Affected: 0010 E
We have completed an inventory of the items that you submitted. We have received the data and the
review and processing fee ($2,300) required to begin a detailed technical review of your request. If
additional data are required, we will inform you within 30 days of the date of this letter.
Please direct all questions concerning your request to our Technical Evaluation Contractor at the following
address:
Michael Baker Jr., Inc.
3601 Eisenhower Avenue, Suite 600
Alexandria, Virginia 22304
Attention: Ms. Laura D. Bittner
(703) 317-6292
When you write us about your request, you must include the case number referenced above in your letter.
2
If you have any questions concerning FEMA policy, or the National Flood Insurance Program in general,
please contact Mr. Alan Johnson of our staff in Washington, DC, either by telephone at (202) 646-3403
or by facsimile at (202) 646-4596.
Sincerely,
Matthew B. Miller, P.E., Chief
Hazards Study Branch
Mitigation Directorate
cc: Mr. Kenneth Griffin, P.E.
Director of Engineering
City of Coppell