Loading...
Shake & Shingle 2-CS120904 MEMORANDUM TO: Larry Davis, Construction Inspector FROM:Rhonda Adloo, Administrative Technician DATE: September 4, 2012 REF: Maintenance Bond Expiration Notice The following Maintenance Bond(s) will expire on date indicated: Project: Date: Shake & Shingle, Phase 2 11/1/12 Please re-inspect the above-mentioned project(s) to see if the public improvements remain in satisfactory condition. If there are outstanding maintenance issues, please allow sufficient time to notify contractor of deficiencies before the bond expires. MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Memo to File From: Larry Davis, Construction Inspector Date: September 4, 2012 RE: Shake & Shingle, Phase 2 As of this date, the above referenced development has been re-inspected for the purpose of noting issues prior to the expiration of the maintenance bond. No issues with maintenance were found. This information was related by phone to Rhonda Adloo, Administrative Technician. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"