Carter Ph 1 FS-CS 990521 FEDERAL EMERGENC~ NIANAGEMENT AGENCY O.M.B No. 3067-0148
REVISION REQUESTER AND COMMUNITY OFFICIAL Expires April 30, 2001
Public reporting burden for this form is 'e~ated to average 2.13 hours per response. The burden estimate includes
the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and
completing and reviewing the form. Send comments regarding the accuracy of the burden estimate and any
suggestions for reducing this burden to: Information Collections Management, Federal Emergency Management
Agency, 500 C Street, S.W., Washington DC 20472; and to the Office of Management and Budget, Paperwork
Reduction Project (3067-0148), Washington, DC 20503.
You are not required to respond to this collection of information unless e valid OMB Control Number is displayed in the upper right comer of this
form.
1. REQUESTED RESPONSE FROM FEMA
This request is for a:
[] CLOMR A letter from FEMA commenting on whether a proposed project, if built as proposed, would justify a map
revision, or proposed hydrology changes (See 44 CFR Ch. 1, Parts 60,65 & 72).
[] LOMR A letter from FEMA officially revising the current NFIP map to show the changes to floodplains,
floodway or flood elevations. LOMRs typically decrease flood hazards. (See 44 CFR Ch. 1 Parts 60 & 65.)
[] Other Describe:
2. OVERVIEW
1. The basis for this revision request is (are): (check all that apply)
[] Physical Change [] Improved Methodology/Data [] Floodway Revision
[] Other Describe:
Note: A photograph is not required, but is very helpful during review.
4. FEMA zone designations affected: ~.~_-., ~,
(example: A, AH, AO, Al-A30, A99, AL, V, V1-V30, VE, B, C, D, X)
5. The NFIP map panel(s) affected for all impacted communities is (are):
CommunityNo. CommunityName I State IMapN°' --~ar~elN°' I EffectiVeDate
I I I
6. The area of revision encompasses the following types of flooding and structures. Check all that apply.
Types of Flooding Structures
[] Riverine [] Channelization
[] Coastal [] Levee/Floodwall
[] Alluvial fan [] Bridge/Culvert
[] Shallow Flooding (e.g. Zones AO and AH) [] Dam
[] Lakes [] Fill
[] Other (describe) [] Other (describe)
PLEASE REFER TO THE INSTRUCTIONS FOR THE APPROPRIATE MAILING ADDRESS
FEMA Form 81-89 Revision Requester and Community Official Form MT-2 Form 1 Page 1 of 2
· ~. ENCROACHMENT INFORMATIL~N
1. Does the State have jurisdiction over the floodway or its adoption by communities participating in the NFIP?
[] Yes [] NO
If Yes, attach a copy of a letter notifying the appropriate State agency of the floodway revision and documentation of the
approval of the revised floodway by the appropriate State agency.
2. Does the development in the floodway cause the 1% annual chance (base) elevation to increase at any location by more
than 0.000 feet? [] Yes [] No [] N/A
3. Does the cumulative effect of all development that has occurred since the effective SFHA was originally identified cause the
base flood elevation to increase at any location by more than one foot (or other increase limit if community or state has
adopted more stringent criteria - even if a floodway has not been delineated by FEMA)? [] Yes ~j No
If the answer to either items is Yes, please attach documentation that all requirements of Section 65.12 of the NFIP regulations
have been met, regarding evaluation of alternatives, notice to individual legal property owners, concurrence of CEO, and
certification that no insurable structures are impacted.
5. MAINTENANCE RESPONSIBILITY
The community is willing to assume responsibility for [] performing [] overseeing compliance with the maintenance
and operation plans of the
flood control structure. If not performed promptly by an owner other than the community, the community will provide the
necessary services without cost to the Federal government.
Operation and maintenance plans are attached. [] Yes [] No j~ NIA
6. REVIEW FEE
The review fee for the appropriate request category has been included. [] Yes Fee amount:
This request is based on a federally sponsored flood-control project where 50 percent or more of the project's cost is
federally sponsored, or the request is based on detailed hydrologic and hydraulic studies conducted by Federal, State, or
local agencies to replace approximate studies conducted by FEMA and shown on the effective FIRM; thus the project is fee
exempt. ~ Yes
Please see Instructions for Fee Amounts
7. SIGNATURE
Note: I understand that my signature indicates that all information Note: Signa~re indicates that the commun~y understands, from the
subm~ed in suppo~ of this r~uest is correct revision requester, t~ impacts of the revision on flooding conditions
~ ~ in the c°mmun~y~~°
Signature of Revision Requester f Community Official
Printed Name and Title of Revision Requester Printed Name and Title of Community Official
Company Nam~ ~d~ ~C~Q~ ~ ~ommun~w_~ame , .....
Telephone No.: -- Date: ~- I~-q~ Telephone No.~~ate: 5
CERTIFICATION BY REGISTERED PROFESSIONAL ENGINEER Check which forms have been included with this request
AND/OR ~ND SURVEYOR
This ce~ification is in accordance with 44 CFR Ch. 1, Sect 65.2 Form Name and (Number) Required if ......
~~ ~ ~~ ~+ 0 "ydm'o,'¢ (3) new or revised discharges
· ~ Hydraulic {4) new or revised water-su~ace elevations
Signature ~ Mapping (5) floodplain/floodway changes
~0~ ~+ ~. ~c'{~ 0 Channelization (6) channel is modified
~~~+ ~5 ' g;C~ ~~ ~ BridgelCulve~ (7) addition/revision of bridge/culve~
Printed Name and Title of ~ision Requiter ' ~ Levee/Fl~wall (8} addition/revision of levee/floodwall
~ Coastal (9} new or revised coastal elevations
Registr No.35~lOExpi~es (Date~-~-~tate mx D Coastal Structures (10) addition/revision of coastal structure
~ Dam (11) addition/revision of dam
Type of License/Expe~ise: ~; v', { ~ ~ ~ ~ Alluvial Fan (12) structures proposed on alluvial fan
Coppell. Texas 75019
//~"--~/~ The City With A Beautiful Future 972-462-0022
"k~_// /.~.~'/ P.O. aox 478
May 19, 1999
Bob Wright, P.E.
Needham Wright Engineers
10290 Monroe Drive, Suite 101
Dallas, TX 75229
RE: Carter Addition Phase II
Dear Mr. Wright:
I have received the information to process to FEMA for the LOMR on the referenced addition.
However, prior to processing, please provide an exhibit to this office indicating exactly where the
various compaction tests were taken. These include tests 5 through 22 as shown on the
information provided from Hooper Engineering Laboratories, Inc. As we have found out on
other reclamations where erosion has taken place after the fact, it's important to know where the
actual tests were taken. Also, I have a question about compactions 1 through 4. Were they not
performed on this site or did they fail the compaction test?
Once this information is provided, the forms can be processed to FEMA for the LOMR. If you
should have any additional questions please feel free to contact me at your convenience.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering and Public Works
~e;.z'~?~'~, NEEDHAM WRIGHT ENGINEERS
A Pate Engineers, Inc. Compa~y
," 10290 Monroe Drive, Suite 101
~ Dallas, Texas 75229
-:"- (214) 357-2981 Fax: (214) 357-2985
-;..'; Email: NEEDHAM@cyberramp.net
.,~
TRANSMITTAL LETTER
To: I~.e~-., ~or-', ~ ~ ~.~_, Date: 5- t,~-~ Job No.~-~2-o ~
C',+~ ~.~', ~_~.~
Co~_ t ~,
Copies Date Description
Items transmitted as checked below:
X Attached For Approval -~ Messenger
× Prints ForYour Use Mail
___ As Requested __ For Review/Comment __ Hand Carried
___ Other by:
Remarks: F_~c..~c_z~ -~c oto~-~, {~.~ ~r~_ ~ C~,~-~ ~
Received Apr-21-99 07:31 from 2143515148 * NEEDHAM WRIGHT ENGRS page 3
84.-21/'L'~ ¢7':35 214352' 9 HS:DPE~ EN3RG L .... ~$E ~
CORRECTED REPORT ~ Correcting "Client"
Hooper Engineering Laboratories, Inc.
Construction M&terlals Testing
REPORT OF IN-PLAC:E DENSITY TESTS
CLIENT: D0nald J, Carter DATE: 22 September 1998
PROJECT: Carter Addition-Phase I), Coppell, & JOB NO,: 98.1056
MATERIAL DESCRIPTION: 1) On-Site Fitl - Dark Brown Silty Ctey
2} On-Site Fill - Dark Brown Silty Clay
ASTM D 698 ,STANDARD PROCTOR; 1) 106.0 pcf ~ 17.0% Moisture
2) 95.0 pcf ~ 22.0% Moisture
MOISTURE DRY PERCENT REQUIRED
LOCATION PROCTOR L!~:T CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
BELOW
SUBGRADE
5) Lot ~1 fill 1 Final 14.9 103,6 97,7 95+
6) LoT #1 fill 1 1' 15,1 t00.9 9,~.2
7) Lot #1 fill 2 2' 20.0 90,3 95.0
8) Lot #2 fill, west side 1 Final 15.0 101.1 95.4
9i Lot #2 fill, west side 1 I' 14.5 101,0 95.3
10) Lot #2 fill, west side 2 2' 18.2 93.5 9B,4
11) Lot #2 fill, east ,~ide i Fi,~¢ 15,9 102.9 97.0
12) Lot #2 fill, east side 1 1' 15,0 101.4 95.6
13) Lot #2 fill, east side 1 2' 13,6 100,8 96.0
14) Lot #3 fill 1 Final 15.0 103.1 97,2
15) Lot #3 fill 1 1' 13.1 101.3 95.5
16) Lot #3 filr 2 2' 18.3 94.0 98.9
17) Lot #4 fill 1 Final 13.O 101.5 95.7
18! Lot #4 fill 2 !' 18.0 90.3 95.0
19) Lot #4 fi~l 2 2' 18.t. 90.9 95.6
20) Lot //5 fill 1 Final ~ 5.7 ] 02.5 96.0
21) Lot #5 fill 2 1' 18.8 92.7 97.5
22] LOt #5 fill 2 2' 19.8 94.2 99.1
TECHNICIAN: MFM
DISTRIBUTION; (1) Donald J, Carter, At,n: Jeff Fink /~ ~.
(1} Needham Wrlghl; Engineers, Inc., Robert L. ¥¥ri~ht ~ ~ ~ * ~
(lJ Tri-Dal L~d., Robert Pierson
(1) City of Coppelt
2870 Walnut Hill Lane Dallas, Texaa 75229 (214) 361~6419 F~ax (21,~) 351-5148
~1~357~985
b~nb i~;l~lE.~_t~HFIPl ~)R'I~MT ~i~R5 ~ 1~-~ 2~;27 ~rom 214~57 '5~214 504 5570
NEEDHAM WRIGHT ENGINEERS
A Pate ~ng~neer$. if~c. Company ' '
FACSIMILE TRANSMITTAL
Please deliver the following pages to:
ATTENTION OF:
FIRM: _ C',
FAX NO.: q-f2/gO4
FROM' ~ 1~ ~ r- i...,~ ~'~' .............................
PROJECT NAME: ~'C~r--{'~ r'- A<::::[di '~-t~"~
PROJECT NO.' c:~-~ _,c[.,,c~ -(~(
NUMBER OF PAGES, INCLUDING COVER SHEET: --~
DATE: ~5 -- I q -qq TIME:
COMMENTS: IE~hC~....!<:~....~p_~:~ ',._~ ~ _~c:::,F~<_1 c::~'~ "["{r-.-~-_. _
i oc.
COPIES TO:
If you did not receive the number of pages indicated, please call immediately.
10290 Monroe Drive, Suite 10"I - Dallas, Texas 75229
Tel- (214) 357-298t Fax: (214) 357-2985
E-mail: NEEDHAM~cyberramp.net
Received Apr 21-~9 e7:3~ frov ~143515148 ~ NEEDHAk IGHI' ENGRS page 2
CORRECTED REPORT - Correcting "Client"
Hooper Engineering Laboratories, In(3.
Conltru=tlen Materials Te.tlng
REPORT OF IN-PLACE nI~N$1T¥ TI=STS
CLIENT: 0~rta)d O. Carter DATE ! 1 Sei~tember 1998
PROJECT: Ca[ter Addit~on-Ph~lse il. Coppe;!, TX, JOE] NO: 98.1056
MATERIA~. DESCRIPTION: 1i On-Site Fdl. Dark Brown Silt"y Ci~¥
ASTM O 698 STANDARD PROCTOR: 1) 106.0 pcf
MOISTURE DRY PERCENT REQUIRED
LOCATION '~RO(;TOR L~F} CONTENT DENSITY COMPACTION COMPACTIDN
% ~(:F % %
Fill Area ~ Futurl~ ~ots*
west and ! F~n. Sub 13.7 ~05.8 99.8 95-
middle-west ~ Fin. Sub 13.4 1 04.6 BB.?
m.ddlJ-east 1 Ch~ Sub. ;0.9 96 9 ~! 4'
'Teat resulte indicate fill is not compacted to re='~red ,~ens;ty.'mois~ure. Cont,actor notified.
NOTE' No lot stakes evaitabla Excava',,r~g ccntcactor ,eclueste~/ density testiPg on final
TECHNICIAN. CDJ ~ ~
DISTRJ~UTJOI~',' I1] Donald J. Carler, A~.n Jeff Fink ~
[1} Needhem ~,~Hght Engineer~. ~nc.. Robert ' Wr;~nt