Loading...
ST0501-LR120830 SEP-03-2012 23: 19 P.01/01 Texa e-M- 9 T > _ AllrA Post-it®Fax Note 7671 Date a oes► P 9 Construction Materials Testing To . /jggy IA V is From - <As. eA�l T / and Environmental Consulting co.ItDePt. Co. / /� r�l i// P-Ir✓SP£eTOR,F�I�, CzEC �S:.i Jia.r4 10044 Monroe Drive • Dallas, Texas 75229 • (214) 352- Phone#43 72-304- 84 Phone#.Z'4,352,‘.7 57 Fax#G) 12 304-35-76 Fax#Z/4.3CZ.6177 , GENERAL REPORT ❑ CANCELLATION • STAND-BY Report Date: August 31,2012 Test Date: August 30,2012 Client: Tiseo Paving Company Cancellation/Standby Report No. 7 Project: Deforest Road Reconstruction Project Number: 211-0126 Identification: Stand-by City of Coppell Project No.: ST-05-01 Page: 1 of 1 Results Scheduled Concrete Arrival Time: 2:00 PM Type of Service Scheduled: Concrete Testing Time Concrete Arrived at Job: 4:09 PM Total Charged Time: 2.0 Hours Reason: Waiting for TXI Delivery of Texas Inlets Concrete Technician: MR cc: Mr.Larry Davis-City of Coppell,Phone:972-304-3684;via Fax:972-304-3570 Mr. George Marshall-City of Coppell,Phone:972-304-3562;via E-mail:gMarshall @coppelltx.gov Mr.Dan DeGroot-Burgess&Niple,Inc.,Phone:972-620-1255;via E-mail:Dan.DeGroot @BurgessNiple.com Mr.Robert Caudill-Tiseo Paving Company,Phone:972-289-0723;via E-mail:rCaudill@TiseoPaving.com Mr. Bobby Bounds-California Construction,Phone:972-670-0368;via E-mail:Bobby @CalConTex.com Texas CMT,Inc. TBPE Firm: F-4521 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Tex s CMT,Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. TOTAL P.01