ST0501-LR120830 SEP-03-2012 23: 19 P.01/01
Texa e-M- 9 T > _
AllrA Post-it®Fax Note 7671 Date a oes►
P 9
Construction Materials Testing To . /jggy IA V is From - <As. eA�l T /
and Environmental Consulting co.ItDePt. Co. / /� r�l i//
P-Ir✓SP£eTOR,F�I�, CzEC �S:.i Jia.r4
10044 Monroe Drive • Dallas, Texas 75229 • (214) 352- Phone#43 72-304- 84 Phone#.Z'4,352,‘.7 57
Fax#G) 12 304-35-76 Fax#Z/4.3CZ.6177 ,
GENERAL REPORT ❑ CANCELLATION • STAND-BY
Report Date: August 31,2012 Test Date: August 30,2012
Client: Tiseo Paving Company Cancellation/Standby Report No. 7
Project: Deforest Road Reconstruction Project Number: 211-0126
Identification: Stand-by City of Coppell Project No.: ST-05-01
Page: 1 of 1
Results
Scheduled Concrete Arrival Time: 2:00 PM
Type of Service Scheduled: Concrete Testing
Time Concrete Arrived at Job: 4:09 PM
Total Charged Time: 2.0 Hours
Reason: Waiting for TXI Delivery of Texas Inlets Concrete
Technician: MR
cc: Mr.Larry Davis-City of Coppell,Phone:972-304-3684;via Fax:972-304-3570
Mr. George Marshall-City of Coppell,Phone:972-304-3562;via E-mail:gMarshall @coppelltx.gov
Mr.Dan DeGroot-Burgess&Niple,Inc.,Phone:972-620-1255;via E-mail:Dan.DeGroot @BurgessNiple.com
Mr.Robert Caudill-Tiseo Paving Company,Phone:972-289-0723;via E-mail:rCaudill@TiseoPaving.com
Mr. Bobby Bounds-California Construction,Phone:972-670-0368;via E-mail:Bobby @CalConTex.com
Texas CMT,Inc. TBPE Firm: F-4521 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of Tex s CMT,Inc. The use of our name must receive
our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.
TOTAL P.01